Siete Wind (ERCOT-27INR0536) — Project Summary

Queue ID
ERCOT-27INR0536
Capacity
492.8 MW
Technology
Wind
Status
active
Location
Webb, TX
Region
ERCOT
Developer
Siete Wind, LLC
IA Status
Facility Study

Siete Wind

ERCOT-27INR0536BetaActiveWindERCOTLBNL + Live

492.8 MW generation in Webb, TX · In queue since July 2025 · Proposed COD January 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

492.8 MW

Capacity

1

Components

Wind

1y 4m

In Queue

Facility Study

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

2y 6m

Facilities Study50%
Queue EntryJul 7, 2025

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-01-03

Queue history
27INR0536 · 16 monthly ERCOT reports, Jun 2025 – Sep 2026

Projected COD moved

1 time

Mar 2027 → Jan 2028

Net change

+10 months

first report to latest

Capacity

493 MW

unchanged in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedJul 7, 2025

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

News-reported activity

From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.

Latest milestonefirst turbine installation · 2009-10offshoreWIND.biz · 2026-01-22

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Jan 3, 2028
From queue filing
Developer in saved assessment
Siete Wind, LLC
From queue filing
Status at research time
Active
Active in the ERCOT queue at the Facility Study stage with no IA date. Global Energy Monitor lists a Siete wind farm as 'shelved', which may refer to the earlier 20INR0047 filing. No evidence of construction or an executed IA.
Financing
Not recorded
Research sources and reasoning (4 recorded sources)

low confidence at research time

  1. cleanview.co/power-projects/planned/wind-farms/texas/27INR0536/siete-wind
  2. cleanview.co/power-projects/planned/wind-farms/texas/20INR0047/siete
  3. gem.wiki/Siete_wind_farm
  4. infrasure.ai/project/ercot-27inr0536-siete-wind

Commercial operation date: Only the LBNL filing gives a specific date (proposed COD 2028-01-03). Cleanview's 'Expected online 2028' for 27INR0536 matches it but looks derived from the queue data, so it is not an independent confirmation. Cleanview lists an older 'Siete' queue entry (20INR0047) as expected online 2029, which looks like a prior filing.

Developer: No source names a parent or operating company for Siete Wind. The news-extracted developer (Dominion Energy, Coastal Virginia Offshore Wind) concerns a different project and was discarded. The Apex Clean Energy results never mention Siete, so they are not evidence of ownership.

Status: LBNL shows the project as active in Facility Study, and nothing credible and specific to 27INR0536 contradicts that. The GEM 'shelved' label is ambiguous about which queue entry it covers, so it is noted but not adopted.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Siete Wind project is a proposed 492.8 MW wind generation facility in Webb County, Texas. The project, developed by Siete Wind, LLC, is currently active in the ERCOT interconnection queue as entry ERCOT-27INR0536, with a queue entry date of July 7, 2025. The proposed commercial operation date is January 3, 2028.

The Siete Wind project has been the subject of recent news coverage, with six articles categorized as industry and regulatory news. The point of interconnection is the 345kV 8718 Triada.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Webb

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Siete Wind, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

345kV 8718 Triada

Data Source

LBNL + Live

DeveloperDominion Energy±offshoreWIND.biz · 2026-01-22
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (4)Beta

Last updated 2026-04-19

View all articles
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.