Briefing on Siete Wind

Entity Briefing
Generated Oct 20, 2026·Dataset freshness not reported
493 MW
Proposed capacity
active
Current status
Wind
Technology
ERCOT
Market / region
2028-01-03
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Siete Wind is a 493 MW Wind project in Texas, currently active.

Siete Wind, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-01-03.

Queue ID
ERCOT-27INR0536
Location
Webb, Texas
Technology
Wind
Developer
Siete Wind, LLC
Market / region
ERCOT
Point of interconnection
345kV 8718 Triada

What stands out

1

Siete Wind is a 493 MW Wind project in Texas with status active.

2

Siete Wind, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-01-03.

4

Latest linked story: “Texas Wind Farm Files for Bankruptcy After Winter Storm Uri Creates $103 Million in Hedge Obligations” (https://chapter11cases.com/, 2026-01-30).

Market and operating context

Queue date
2025-07-07
Proposed COD
2028-01-03
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Siete Wind — verified asset snapshot

FieldValue
Queue IDERCOT-27INR0536
LocationWebb, Texas
TechnologyWind
DeveloperSiete Wind, LLC
Market / regionERCOT
Point of interconnection345kV 8718 Triada
Queue date2025-07-07
Proposed COD2028-01-03