Siete Wind is a 493 MW Wind project in Texas, currently active.
Siete Wind, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-01-03.
- Queue ID
- ERCOT-27INR0536
- Location
- Webb, Texas
- Technology
- Wind
- Developer
- Siete Wind, LLC
- Market / region
- ERCOT
- Point of interconnection
- 345kV 8718 Triada
What stands out
Siete Wind is a 493 MW Wind project in Texas with status active.
Siete Wind, LLC is the reported developer.
The reported queue phase is Facility Study; proposed COD is 2028-01-03.
Latest linked story: “Texas Wind Farm Files for Bankruptcy After Winter Storm Uri Creates $103 Million in Hedge Obligations” (https://chapter11cases.com/, 2026-01-30).
Market and operating context
- Queue date
- 2025-07-07
- Proposed COD
- 2028-01-03
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.