Brickyard Energy Storage
309.96 MW storage in Boone, IN · In queue since August 2025 · Proposed COD February 2028
309.96 MW
Capacity
1
Components
Battery
1y 3m
In Queue
In Progress (unknown study)
IA Phase
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
2y 6m
Interconnection request submitted to ISO/RTO
MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.
Typical: 30–40 months (historical); 12 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-02-25
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (6 recorded sources)
medium confidence at research time
- modoenergy.com/research/en/miso-eras-cycle-3-bess-fast-track
- cdn.misoenergy.org/ERAS%20Interconnection%20Requests718481.pdf?v=20250925100448
- floridapsc.com/library/FILINGS/2025/03886-2025/03886-2025.pdf
- psc.state.fl.us/library/Financials/EI802-DOCS/ANNUAL-REPORTS/EI802-25-AR.pdf
- interconnection.fyi/project/miso-e0021
- infrasure.ai/project/miso-e0021-brickyard-energy-storage
Commercial operation date: Only the LBNL proposed COD (2028-02-25) is available, and the interconnection.fyi mirror shows 2028-02-24. No news or press release gives a newer, financing-backed target.
Developer: Modo Energy's MISO ERAS Cycle 3 list pairs Brickyard Energy Storage with NextEra Energy. FPL's Florida PSC affiliate filings also list a 'Brickyard Energy Storage, LLC' among NextEra-family entities. LBNL's 'Brickyard Energy Storge, LLC' (sic) is the project shell.
Status: LBNL, infrasure and interxdata show the project as active, and Modo lists it in ERAS Cycle 3 as of March 2026. The single 'withdrawn' listing is undated and uncorroborated, so LBNL's Active status is retained.
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Brickyard Energy Storage is a proposed battery energy storage development project located in Boone County, Indiana. The project has a total capacity of 309.96 MW, consisting entirely of battery storage. It is being developed by Brickyard Energy Storge, LLC, and AES Indiana is the associated utility. The project is planned to connect to the grid at the Hortonville-Whitestown 345kV point of interconnection.
The project is listed as active in the Midcontinent Independent System Operator (MISO) interconnection queue under queue ID MISO-E0021. It entered the queue on August 6, 2025, and has requested Network Resource Interconnection Service (NRIS). Its interconnection agreement status is listed as in progress, with the specific study phase not identified. The proposed commercial operation date is February 25, 2028.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
IN
County
Boone
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
Brickyard Energy Storge, LLC
Utility
AES Indiana
Entity
MISO
Service Type
NRIS
Point of Interconnection
Hortonville-Whitestown 345kV
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- MISO
- Trading Hub
- INDIANA.HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Battery storage queue pipeline
Summary analysis with parallel narrative sections and visualizations.
Battery Storage queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Brickyard Energy Storage
Data-driven briefing on Brickyard Energy Storage — fleet, generation, financial, and news signals.
Battery Storage queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.