Brickyard Energy Storage
Type
Entity Briefing
Entity
Brickyard Energy Storage
Generated
2026-10-11T06:59:05.708Z

Briefing on Brickyard Energy Storage

Entity Briefing
Generated Oct 11, 2026·Dataset freshness not reported
310 MW
Proposed capacity
active
Current status
Battery
Technology
MISO
Market / region
2028-02-25
Proposed COD
In Progress (unknown study)
Queue phase
Briefing/projectactive

Brickyard Energy Storage is a 310 MW Battery project in Indiana, currently active.

Brickyard Energy Storge, LLC is the reported developer. The reported queue phase is In Progress (unknown study). Proposed COD is 2028-02-25.

Queue ID
MISO-E0021
Location
Boone, Indiana
Technology
Battery
Developer
Brickyard Energy Storge, LLC
Market / region
MISO
Point of interconnection
Hortonville-Whitestown 345kV

What stands out

1

Brickyard Energy Storage is a 310 MW Battery project in Indiana with status active.

2

Brickyard Energy Storge, LLC is the reported developer.

3

The reported queue phase is In Progress (unknown study); proposed COD is 2028-02-25.

Market and operating context

Queue date
2025-08-06
Proposed COD
2028-02-25
IA status
In Progress (unknown study)
Study phase
In Progress (unknown study)
Service type
NRIS

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Brickyard Energy Storage — verified asset snapshot

FieldValue
Queue IDMISO-E0021
LocationBoone, Indiana
TechnologyBattery
DeveloperBrickyard Energy Storge, LLC
Market / regionMISO
Point of interconnectionHortonville-Whitestown 345kV
Queue date2025-08-06
Proposed COD2028-02-25