Briefing/projectactive
Brickyard Energy Storage is a 310 MW Battery project in Indiana, currently active.
Brickyard Energy Storge, LLC is the reported developer. The reported queue phase is In Progress (unknown study). Proposed COD is 2028-02-25.
- Queue ID
- MISO-E0021
- Location
- Boone, Indiana
- Technology
- Battery
- Developer
- Brickyard Energy Storge, LLC
- Market / region
- MISO
- Point of interconnection
- Hortonville-Whitestown 345kV
What stands out
1
Brickyard Energy Storage is a 310 MW Battery project in Indiana with status active.
2
Brickyard Energy Storge, LLC is the reported developer.
3
The reported queue phase is In Progress (unknown study); proposed COD is 2028-02-25.
Market and operating context
- Queue date
- 2025-08-06
- Proposed COD
- 2028-02-25
- IA status
- In Progress (unknown study)
- Study phase
- In Progress (unknown study)
- Service type
- NRIS
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.