Willard Storage (NYISO-C24-148)
300 MW storage in Rensselaer, NY · In queue since December 2024 · Proposed COD October 2028
300 MW
Capacity
1
Components
Battery
1y 11m
In Queue
—
IA Status
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
3y 10m
Interconnection request submitted to ISO/RTO
ISO-NE is transitioning to cluster studies per FERC Order 2023.
Typical: 25–30 months (recent)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-10-01
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (4 recorded sources)
low confidence at research time
- infrasure.ai/project/nyiso-c24-148-willard-storage
- infrasure.ai/project/iso-ne-1595-willard-storage-nyiso-c24-148
- interconnection.fyi/project/nyiso-c24-148
- interconnection.fyi/project/isone-1595
Commercial operation date: No press release or developer announcement gives a COD. Queue-derived aggregators mostly cluster around late 2028 (ISO-NE listing 2028-09-30, NYISO listing 2028-11-30 or 2028-12-01), which is consistent with LBNL's 2028-10-01. Outliers of 2029 (Cleanview) and 2030 (an interconnection.fyi excerpt) are unsupported.
Developer: LBNL's developer field is null. Two NYISO-derived aggregator pages (Infrasure, interconnection.fyi) name Emeren US, LLC as developer/owner, and nothing conflicts with that. No press release confirms it.
Status: LBNL lists the project as active, and every aggregator that reports a status also says active. None report an IA, permit or construction start.
About
Generated Apr 10, 2026 · Predates Oct 25, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Willard Storage (NYISO-C24-148) project is a proposed 300 MW battery storage project located in Rensselaer County, New York. The project is listed in the ISO-NE interconnection queue as queue ID ISO-NE-1595, with a queue entry date of December 12, 2024. The proposed commercial operation date is October 1, 2028.
The project is interconnected to the NYISO Eastover 115 kV point of interconnection. The project has appeared in recent news.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ISONE queue source as of: Oct 25, 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
NY
County
Rensselaer
Grid Region
ISO New England
Market
ISO/RTO Member
Developer
—
Utility
—
Entity
ISO-NE
Service Type
NRIS
Point of Interconnection
NYISO Eastover 115 kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ISO-NE
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
KCE NY 2
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
KCE NY 31
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Battery storage queue pipeline
Summary analysis with parallel narrative sections and visualizations.
KCE NY 21
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.