Willard Storage
300 MW storage in Rensselaer, NY · In queue since September 2024 · Proposed COD December 2028
300 MW
Capacity
1
Components
Battery
2y 2m
In Queue
—
IA Status
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
4y 3m
Study Phase
C24
Interconnection request submitted to ISO/RTO
NYISO transitioned to a Transitional Cluster Study (TCS) format in 2024.
Typical: >42 months (historical); ~24 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-12-01
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (4 recorded sources)
low confidence at research time
- nyiso.com/documents/20142/50558845/02_03%2024%202025%20-%20Interconnection%20Cluster%20Study_%20Projects%20Dashboard%202025%20R11.pdf/e4e8b0d6-f5ce-4cd8-a640-761210eb5dc6
- backwell.com/bess/new-york/rensselaer-county/
- cleanview.co/power-projects/planned/battery-storage-projects/new-york/C24-148_willard_storage/willard-storage
- interconnection.fyi/project/nyiso-c24-148
Commercial operation date: Only the LBNL queue filing gives a specific COD (2028-12-01). Cleanview's 'Expected online 2028' is consistent with it but likely derives from the same queue data, so it is not independent confirmation. No developer press release or news article gives a financing-backed target.
Developer: The LBNL filing, the NYISO cluster dashboard (Mar 2025) and Backwell all list Emeren US, LLC. These repeat the queue filing, and no source names a different parent or operating company. Emeren's corporate relationship is not verified in the findings, so the LBNL name is kept.
Status: LBNL, interconnection.fyi, Cleanview and Backwell all show the project as active or planned. No source shows an IA, construction, withdrawal or suspension.
About
Generated Apr 10, 2026 · Predates Sep 30, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Willard Storage project is a proposed 300 MW battery storage project located in Rensselaer County, New York. Developed by Emeren US, LLC, the project is interconnected to the NYISO grid at the Eastover 115kV point of interconnection. It entered the NYISO interconnection queue as queue ID NYISO-C24-148 on September 10, 2024, with a proposed commercial operation date of December 1, 2028.
The development project consists entirely of battery storage, with a total capacity of 300 MW. The project is currently listed as active in the NYISO interconnection queue and has been featured in recent news coverage.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- NYISO queue source as of: Sep 30, 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
NY
County
Rensselaer
Grid Region
NYISO (New York)
Market
ISO/RTO Member
Developer
Emeren US, LLC
Utility
NM-NG
Entity
NYISO
Service Type
—
Point of Interconnection
Eastover 115kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- NYISO
- Trading Hub
- ZONE F
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- COLONIE_LFGE__
- POI Substation
- Eastover Road Station
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
KCE NY 2
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
KCE NY 31
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Battery storage queue pipeline
Summary analysis with parallel narrative sections and visualizations.
KCE NY 21
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.