Permian I Wind (ERCOT-30INR0086) — Project Summary

Queue ID
ERCOT-30INR0086
Capacity
636.54 MW
Technology
Wind
Status
active
Location
Pecos, TX
Region
ERCOT
Developer
S&S Renewables, LLC
IA Status
—

Permian I Wind

ERCOT-30INR0086BetaActiveWindWind TurbineERCOTLive · ERCOT

636.54 MW generation in Pecos, TX · In queue since January 2026 · Proposed COD June 2030

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

636.54 MW

Capacity

0

Components

10 months

In Queue

—

IA Status

COD target: 2030

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4y 5m

Pre-Study0%
Queue EntryJan 26, 2026

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2030-06-30

Queue history
30INR0086 · 9 monthly ERCOT reports, Jan 2026 – Sep 2026

Projected COD moved

0 times

Jun 2030 → Jun 2030

Net change

0 months

first report to latest

Capacity

637 → 637 MW

changed in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedJan 26, 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Jun 30, 2030
From queue filing
Developer in saved assessment
S&S Renewables, LLC
From queue filing
Status at research time
Active
Active in the ERCOT queue (filed Jan 2026) with no interconnection agreement; ercotqueue.com lists a 12% build-chance. No construction or financing signals found.
Financing
Not recorded
Research sources and reasoning (4 recorded sources)

low confidence at research time

  1. infrasure.ai/project/ercot-30inr0086-permian-i-wind
  2. cleanview.co/power-projects/planned/wind-farms/texas/30INR0086/permian-i-wind
  3. interconnection.fyi/project/ercot-30inr0086
  4. ercotqueue.com/project/30INR0086

Commercial operation date: Only the LBNL proposed COD of 2030-06-30 is available. Cleanview's 'Expected online 2030' is consistent with it but is a queue aggregator, not an independent developer-backed target.

Developer: Queue aggregators (infrasure, ercotqueue) name S&S Renewables, LLC, but they derive from the same ERCOT filing. No press release or news identifies a parent or operating company.

Status: LBNL and interconnection.fyi both show the project as active, and no source reports withdrawal or construction. The news results are generic Permian Basin coverage and say nothing about this project.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Permian I Wind is a proposed wind generation project located in Pecos County, Texas, within the ERCOT region. The project, developed by S&S Renewables, LLC, has a total capacity of 636.52 MW. It is listed in the ERCOT interconnection queue as entry ERCOT-30INR0086, with a queue entry date of January 26, 2026, and a proposed commercial operation date of June 30, 2030. The point of interconnection is the Tap TNMP White Baker (38435)–Bottlebrush (38441) 345-kV double-circuit.

The Permian I Wind project has been mentioned in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Pecos

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

S&S Renewables, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap TNMP White Baker (38435)–Bottlebrush(38441) 345-kV double-circuit

Data Source

Live · ERCOT

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (1)Beta

Last updated 2026-03-26

View all articles
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.