Glass Mountain Solar 1 (ERCOT-29INR0183) — Project Summary

Queue ID
ERCOT-29INR0183
Capacity
304.3 MW
Technology
Solar
Status
active
Location
Pecos, TX
Region
ERCOT
Developer
Glass Mountain Solar, LLC
IA Status
Facility Study

Glass Mountain Solar 1

ERCOT-29INR0183BetaActiveSolarERCOTLBNL + Live

304.3 MW generation in Pecos, TX · In queue since September 2025 · Proposed COD February 2029

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

304.3 MW

Capacity

1

Components

Solar

1y 2m

In Queue

Facility Study

IA Phase

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

3y 5m

Facilities Study50%
Queue EntrySep 22, 2025

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-02-05

Queue history
29INR0183 · 13 monthly ERCOT reports, Sep 2025 – Sep 2026

Projected COD moved

2 times

Mar 2029 → Feb 2029

Net change

-1 months

first report to latest

Capacity

304 → 302 MW

changed in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedSep 22, 2025

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
2029
Developer in saved assessment
Apex Clean Energy
Filed as Glass Mountain Solar, LLC
Status at research time
Active
Active in the ERCOT queue at the Facility Study stage with no IA executed. Developer is still developing the project, with no construction or financing announced.
Financing
Not recorded

Milestones in this assessment

COD target2029Latest in this assessment

Glass Mountain Energy hybrid project page lists a 2029 target for operations.

glassmountainenergy.com
Research sources and reasoning (2 recorded sources)

medium confidence at research time

  1. glassmountainenergy.com/
  2. infrasure.ai/project/ercot-29inr0183-glass-mountain-solar-1

Commercial operation date: The Glass Mountain Energy project site lists a 2029 target for the Pecos County hybrid project (500 MW wind + 300 MW solar), which is consistent with LBNL's proposed COD of 2029-02-05. The site does not give a specific date, so the LBNL date is kept as the more precise value, but the year agrees.

Developer: The Glass Mountain Energy project website says Apex Clean Energy is developing the Pecos County wind and solar facility, and the ~300 MW solar component matches this 304.3 MW project. The LBNL filing entity, Glass Mountain Solar, LLC, appears to be the project shell. The match rests on name, county and capacity, not an explicit link to the queue ID.

Status: LBNL shows active status with a Facility Study IA status, and the developer website describes the project as under development. No source indicates construction, withdrawal or suspension.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Glass Mountain Solar 1 is a proposed 304.3 MW solar generation project located in Pecos County, Texas. The project, developed by Glass Mountain Solar, LLC, is listed in the ERCOT interconnection queue as entry ERCOT-29INR0183, with a queue entry date of September 22, 2025. The proposed commercial operation date is February 5, 2029.

The project is currently listed as active in the queue. Recent news coverage indicates industry interest in the development.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Pecos

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Glass Mountain Solar, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 345 60404 SOLSTICE - 18669 TOYAHCRK_5

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.