Briefing/projectactive
Glass Mountain Solar 1 is a 304 MW Solar project in Texas, currently active.
Glass Mountain Solar, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-02-05.
- Queue ID
- ERCOT-29INR0183
- Location
- Pecos, Texas
- Technology
- Solar
- Developer
- Glass Mountain Solar, LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 345 60404 SOLSTICE - 18669 TOYAHCRK_5
What stands out
1
Glass Mountain Solar 1 is a 304 MW Solar project in Texas with status active.
2
Glass Mountain Solar, LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2029-02-05.
Market and operating context
- Queue date
- 2025-09-22
- Proposed COD
- 2029-02-05
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.