Blue Spring Solar
301 MW generation in Haskell, TX · In queue since October 2025 · Proposed COD October 2028
301 MW
Capacity
1
Components
Solar
1y 1m
In Queue
Facility Study
IA Phase
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
3 years
Interconnection request submitted to ISO/RTO
SS Completed, FIS Started, No IA
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-10-28
Projected COD moved
0 times
Oct 2028 → Oct 2028
Net change
0 months
first report to latest
Capacity
301 MW
unchanged in the reports
Latest stage
Screening started
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (2 recorded sources)
low confidence at research time
- infrasure.ai/project/ercot-28inr0433-blue-spring-solar
- cleanview.co/power-projects/planned/solar-farms/texas/28INR0433/blue-spring-solar
Commercial operation date: Only the LBNL/ERCOT filing gives a date (proposed COD 2028-10-28). The Cleanview and infrasure.ai pages ("Expected online 2028", "Proposed COD October 2028") appear to be derived from the same queue data, so they are not independent confirmation. The news-extracted 'commercial operations achieved 2025' fact refers to a project called 'Escape', not Blue Spring Solar, and was discarded.
Developer: Only the LBNL filing and the infrasure.ai page derived from it name Flat Creek Solar, LLC. The news fact naming 'Estuary Power' is attached to a project named 'Escape' with a COD already achieved, which does not match this October 2025 queue entry at Facility Study stage. I did not use it as a parent link, and no source ties Flat Creek Solar to a parent company.
Status: The LBNL status is 'active', and the infrasure.ai page confirms the Facility Study phase with no interconnection agreement executed. No sources contradict this.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Blue Spring Solar is a proposed 301 MW solar photovoltaic generation project located in Haskell County, Texas. Developed by Flat Creek Solar, LLC, the project is currently active in the ERCOT interconnection queue as entry ERCOT-28INR0433, with a queue entry date of October 3, 2025. The proposed commercial operation date is October 28, 2028.
The Blue Spring Solar project has been the subject of recent news coverage, including reports in industry and deals publications.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Haskell
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Flat Creek Solar, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
#60515 Clear Crossing 345 kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- AZURE_RN
- POI Substation
- Clear Crossing Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-03-26
View all articlesTOCE TX BESS 2
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Texas energy overview
Summary analysis with parallel narrative sections and visualizations.
State-by-state breakdown for ERCOT (Texas)
Summary analysis with parallel narrative sections and visualizations.
Blue Spring Solar
Data-driven briefing on Blue Spring Solar — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.