Gardner Draw Solar (ERCOT-27INR0355) — Project Summary

Queue ID
ERCOT-27INR0355
Capacity
300 MW
Technology
Solar
Status
active
Location
Glasscock, TX
Region
ERCOT
Developer
RWE Clean Energy Development, LLC
IA Status
IA Executed

Gardner Draw Solar

ERCOT-27INR0355BetaActiveSolarERCOTLBNL + Live

300 MW generation in Glasscock, TX · In queue since October 2024 · Proposed COD June 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

300 MW

Capacity

1

Components

Solar

2y 1m

In Queue

IA Executed

IA Phase

Signed Aug 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

10 months

IA → COD

2y 10m

Total Duration

10 months

Construction75%
Queue EntryOct 1, 2024

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementAug 7, 2025

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Completed, IA

Project under construction

Typical: 12–24 months

Commercial Operation

Proposed COD: 2028-06-01

Queue history
27INR0355 · 25 monthly ERCOT reports, Sep 2024 – Sep 2026

Projected COD moved

1 time

Dec 2027 → Jun 2028

Net change

+6 months

first report to latest

Capacity

200 → 310 MW

changed in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedOct 1, 2024
Facilities study approvedSep 16, 2026
Interconnection agreement signedAug 7, 2025

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Jun 1, 2028
From queue filing
Developer in saved assessment
RWE Clean Energy
Filed as RWE Clean Energy Development, LLC
Status at research time
IA Executed
Active in the ERCOT queue with an interconnection agreement signed Aug 2025. Aggregators disagree on study phase: one says Facility Study, another says 'IA, FIS pending'. No construction start has been announced.
Financing
Not recorded

Milestones in this assessment

IA executedAug 2025Latest in this assessment

Interconnection agreement executed (Aug 2025), consistent with the LBNL IA date of 2025-08-07.

infrasure.ai
Research sources and reasoning (4 recorded sources)

low confidence at research time

  1. infrasure.ai/project/ercot-27inr0355-gardner-draw-solar
  2. cleanview.co/power-projects/planned/solar-farms/texas/27INR0355/gardner-draw-solar
  3. ercotqueue.com/project/27INR0355
  4. ercotqueue.com/developer/rwe-solar-development-llc

Commercial operation date: LBNL lists a proposed COD of 2028-06-01 and Cleanview says 'Expected online 2028'. Infrasure shows 2027-12-31, but that is only about 6 months earlier and looks like a queue-data derivative, not a developer announcement. No press release or news gives a financing-backed date, so LBNL stands.

Developer: LBNL and Infrasure name RWE Clean Energy Development, LLC. ErcotQueue aggregates that entity with other RWE filing LLCs under one RWE developer profile, so it is an RWE development vehicle and the operating parent is RWE. No ownership change was found.

Status: LBNL shows IA Executed with an IA date of 2025-08-07, and Infrasure confirms an Aug 2025 signing. The interXdata 'operational' label conflicts with all other sources and was disregarded.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Gardner Draw Solar project is a proposed 200 MW solar generation facility in Glasscock County, Texas. Developed by RWE Clean Energy Development, LLC, the project is currently active in the ERCOT interconnection queue as entry ERCOT-27INR0355, with a queue entry date of October 1, 2024.

The proposed commercial operation date for Gardner Draw Solar is December 31, 2027. The project's interconnection status is currently in the Facility Study phase, and the point of interconnection is the 59902 Sand Bluff 345kV location. The project has appeared in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Glasscock

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

RWE Clean Energy Development, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

59902 Sand Bluff 345kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
MEDIUM
POI Substation
Sand Bluff Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.