Briefing/projectactive
Gardner Draw Solar is a 300 MW Solar project in Texas, currently active.
RWE Clean Energy Development, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2027-12-31.
- Queue ID
- ERCOT-27INR0355
- Location
- Glasscock, Texas
- Technology
- Solar
- Developer
- RWE Clean Energy Development, LLC
- Market / region
- ERCOT
- Point of interconnection
- 59902 Sand Bluff 345kV
What stands out
1
Gardner Draw Solar is a 300 MW Solar project in Texas with status active.
2
RWE Clean Energy Development, LLC is the reported developer.
3
The reported queue phase is IA Executed; proposed COD is 2027-12-31.
Market and operating context
- Queue date
- 2024-10-01
- Proposed COD
- 2027-12-31
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.