Buffalo Gap 1 Wind Repower (ERCOT-26INR0622) — Project Summary

Queue ID
ERCOT-26INR0622
Capacity
120.23 MW
Technology
Wind
Status
active
Location
Nolan, TX
Region
ERCOT
Developer
Buffalo Gap Wind Farm, LLC
IA Status
IA Executed

Buffalo Gap 1 Wind Repower

ERCOT-26INR0622BetaActiveWindERCOTLBNL + Live

120.23 MW generation in Nolan, TX · In queue since January 2025 · Proposed COD February 2027

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

120.23 MW

Capacity

1

Components

Wind

1y 10m

In Queue

IA Executed

IA Phase

COD target: 2027

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

2y 1m

Construction75%
Queue EntryJan 28, 2025

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Completed, IA

Project under construction

Typical: 18–36 months

Commercial Operation

Proposed COD: 2027-02-01

Queue history
26INR0622 · 21 monthly ERCOT reports, Jan 2025 – Sep 2026

Projected COD moved

1 time

Dec 2026 → Feb 2027

Net change

+2 months

first report to latest

Capacity

120 → 120 MW

changed in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedJan 28, 2025
Facilities study approvedMar 17, 2026
Interconnection agreement signedFeb 28, 2005

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
Feb 1, 2027
From queue filing
Developer in saved assessment
Buffalo Gap Wind Farm, LLC
From queue filing
Status at research time
Active
Active — IA Executed, repower project targeting 2027 COD
Financing
Not recorded

Milestones in this assessment

IA executedJan 28, 2025Latest in this assessment

Interconnection Agreement executed, queue position secured

lbnl_queue_snapshot
Research sources and reasoning (1 recorded sources)

low confidence at research time

  1. lbnl_queue_snapshot

Commercial operation date: Only LBNL queue data available with proposed COD of February 2027. No independent news or press releases found to validate or contradict this target date.

Developer: Buffalo Gap Wind Farm, LLC appears to be the operating entity for this repower project. No evidence of shell LLC structure or parent company differentiation found in available sources.

Status: LBNL shows IA Executed status with active queue position. This is a repower of existing Buffalo Gap 1 facility, suggesting established site with interconnection rights.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Buffalo Gap 1 Wind Repower is a proposed 120.23 MW wind generation project located in Nolan County, Texas. Developed by Buffalo Gap Wind Farm, LLC, the project is listed in the ERCOT interconnection queue as entry ERCOT-26INR0622, with a queue entry date of January 28, 2025. The proposed commercial operation date is February 1, 2027.

An Interconnection Agreement (IA) for a previous project at this location was executed on February 28, 2005. The point of interconnection is the 6216 Bluff Creek Substation at 138kV. The project is currently listed as active in the interconnection queue, and has appeared in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Nolan

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Buffalo Gap Wind Farm, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

6216 Bluff Creek Substation 138kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
MEDIUM
Nearest Node (Estimated)
HHOLLW2_WND1
POI Substation
Bluff Creek Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.