Buffalo Gap 1 Wind Repower
120.23 MW generation in Nolan, TX · In queue since January 2025 · Proposed COD February 2027
120.23 MW
Capacity
1
Components
Wind
1y 10m
In Queue
IA Executed
IA Phase
COD target: 2027
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
2y 1m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
SS Completed, FIS Completed, IA
Project under construction
Typical: 18–36 months
Proposed COD: 2027-02-01
Projected COD moved
1 time
Dec 2026 → Feb 2027
Net change
+2 months
first report to latest
Capacity
120 → 120 MW
changed in the reports
Latest stage
IA signed
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.
Milestones in this assessment
Interconnection Agreement executed, queue position secured
lbnl_queue_snapshotResearch sources and reasoning (1 recorded sources)
low confidence at research time
- lbnl_queue_snapshot
Commercial operation date: Only LBNL queue data available with proposed COD of February 2027. No independent news or press releases found to validate or contradict this target date.
Developer: Buffalo Gap Wind Farm, LLC appears to be the operating entity for this repower project. No evidence of shell LLC structure or parent company differentiation found in available sources.
Status: LBNL shows IA Executed status with active queue position. This is a repower of existing Buffalo Gap 1 facility, suggesting established site with interconnection rights.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Buffalo Gap 1 Wind Repower is a proposed 120.23 MW wind generation project located in Nolan County, Texas. Developed by Buffalo Gap Wind Farm, LLC, the project is listed in the ERCOT interconnection queue as entry ERCOT-26INR0622, with a queue entry date of January 28, 2025. The proposed commercial operation date is February 1, 2027.
An Interconnection Agreement (IA) for a previous project at this location was executed on February 28, 2005. The point of interconnection is the 6216 Bluff Creek Substation at 138kV. The project is currently listed as active in the interconnection queue, and has appeared in recent news coverage.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Nolan
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Buffalo Gap Wind Farm, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
6216 Bluff Creek Substation 138kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_WEST
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- HHOLLW2_WND1
- POI Substation
- Bluff Creek Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Buffalo Gap 1 Wind Repower
Data-driven briefing on Buffalo Gap 1 Wind Repower — fleet, generation, financial, and news signals.
Buffalo Gap Wind Farm
Data-driven briefing on Buffalo Gap Wind Farm — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.