Query
Buffalo Gap 1 Wind Repower
Type
Entity Briefing
Entity
Buffalo Gap 1 Wind Repower
Technology
wind
Generated
2026-10-19T08:40:35.685Z

Briefing on Buffalo Gap 1 Wind Repower

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
120 MW
Proposed capacity
active
Current status
Wind
Technology
ERCOT
Market / region
2027-02-01
Proposed COD
IA Executed
Queue phase
Briefing/projectactive

Buffalo Gap 1 Wind Repower is a 120 MW Wind project in Texas, currently active.

Buffalo Gap Wind Farm, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2027-02-01.

Queue ID
ERCOT-26INR0622
Location
Nolan, Texas
Technology
Wind
Developer
Buffalo Gap Wind Farm, LLC
Market / region
ERCOT
Point of interconnection
6216 Bluff Creek Substation 138kV

What stands out

1

Buffalo Gap 1 Wind Repower is a 120 MW Wind project in Texas with status active.

2

Buffalo Gap Wind Farm, LLC is the reported developer.

3

The reported queue phase is IA Executed; proposed COD is 2027-02-01.

Market and operating context

Queue date
2025-01-28
Proposed COD
2027-02-01
IA status
IA Executed
Study phase
IA Executed

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Buffalo Gap 1 Wind Repower — verified asset snapshot

FieldValue
Queue IDERCOT-26INR0622
LocationNolan, Texas
TechnologyWind
DeveloperBuffalo Gap Wind Farm, LLC
Market / regionERCOT
Point of interconnection6216 Bluff Creek Substation 138kV
Queue date2025-01-28
Proposed COD2027-02-01