Buffalo Gap Wind Farm is a 121 MW Onshore Wind Turbine asset in ERCOT (Texas), currently Operating.
Buffalo Gap Wind Farm is reported in Texas since 2006 under AES. Available operating and financial measures include 16.9% capacity factor and 179 GWh annual generation; $1895/kW reported CapEx.
- Location
- Taylor, Texas
- Technology
- Onshore Wind Turbine
- Owner / parent
- AES
- Operator
- AES Distributed Energy
- Grid
- ERCOT (Texas)
- Plant ID
- 56240
What stands out
Buffalo Gap Wind Farm is a 121 MW Onshore Wind Turbine asset in Texas with status Operating.
Latest annual operating measures report 16.9% capacity factor and 179 GWh annual generation.
Available financial measures include $1895/kW CapEx.
Latest linked story: “AES Adds 170 MW to Buffalo Gap Wind Farm - Texas Wind Platform Now at 524 MW” (Centrica, 2008-09-24).
Market and operating context
- ISO / market
- ERCOT (Texas)
- Balancing authority
- Electric Reliability Council of Texas, Inc.
- NERC region
- TRE
- State rank
- #194 of 252
- National rank
- #623 of 1,442
Why it matters
For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.