Search plants, projects, owners, and states
120.6 MW Wind operating in Taylor, TX
120.6 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2006
Operating Since
Coordinates
41.8918, -92.9835
County
Taylor, TX
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | AES Distributed Energy | AES | — |
| Owner(s) | AES Distributed Energy | AES | — |
| Status | Operating | operating | — |
The Buffalo Gap Wind Farm is a 120.6 MW wind power plant located in Taylor County, Texas. The plant began operating in 2006 and consists of a single generator utilizing onshore wind turbine technology. The primary fuel source is wind (WND). The facility is owned by AES and operated by AES Distributed Energy.
The wind farm's turbines have a hub height of 78 meters and a rotor diameter of 80 meters. The turbines were manufactured by Vestas, model V80-1.8. In its latest year of reported generation, the plant produced 178,961 MWh of electricity, achieving a capacity factor of 16.9%. The Buffalo Gap Wind Farm operates within the Electric Reliability Council of Texas, Inc. (ERCOT) balancing authority. It is ranked as the 186th largest wind farm in Texas out of 200, and 607th nationally out of 734.
Generated from EIA, GEM, and public data sources
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
Electric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
135.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
16.7K MWh
Latest Month
179.0K MWh
Annual Generation
16.9%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2013
$1,895/kW
Est. Construction Cost
Total estimated cost: $228.6M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Point of Interconnection
Nearest Substation
Buffalo Gap 1 & 3 Substation · 138 kV
Substation Distance
< 10 km
Operator
AES Corporation
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ERCOT
LMP Node
—
Pricing Hub
HB_WEST
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Buffalo Gap Wind FarmForward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demo