Rio Hondo BESS
200.78 MW storage in Cameron, TX · In queue since May 2024 · Proposed COD June 2028
200.78 MW
Capacity
1
Components
Battery
2y 6m
In Queue
Facility Study
IA Phase
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
4y 1m
Interconnection request submitted to ISO/RTO
SS Completed, FIS Started, No IA
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-06-30
Projected COD moved
1 time
Mar 2027 → Jun 2028
Net change
+15 months
first report to latest
Capacity
201 MW
unchanged in the reports
Latest stage
Screening started
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.
Milestones in this assessment
Entered ERCOT queue as 26INR0461, Facility Study phase
renewablesinfo.orgResearch sources and reasoning (4 recorded sources)
medium confidence at research time
- renewablesinfo.org/project/ercot-26inr0461-rio-hondo-bess
- ercotqueue.com/project/26INR0461
- energy-storage.news/blackstones-aypa-power-secures-california-bess-agreement-texas-tax-exemption/
- interconnectionfyi.substack.com/p/interconnection-weekly-project-updates-602
Commercial operation date: Only LBNL queue snapshot provides a COD target of June 2028. No news articles, press releases, or financing announcements found to validate or update this date. Project is early-stage (Facility Study phase).
Developer: LBNL filing uses project LLC 'SBESS TX25 LLC'. Energy-Storage.News article (June 2024) identifies Aypa Power as Blackstone portfolio company developing Texas BESS projects with tax exemptions, matching the naming pattern and timeline. SBESS likely stands for 'Storage BESS' under Aypa's project structure.
Status: LBNL status 'active' with Facility Study phase confirmed. No news of permitting, financing, or construction milestones. Ercotqueue.com assigns 5% build probability, indicating speculative early-stage project.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Rio Hondo BESS project is a proposed 200.78 MW battery storage project located in Cameron County, Texas. The developer is SBESS TX25 LLC. It is interconnected within the ERCOT region under queue ID ERCOT-26INR0461, with a queue entry date of May 9, 2024. The project's proposed commercial operation date is June 30, 2028, and its interconnection agreement status is currently in the Facility Study phase.
The Rio Hondo BESS project consists of 200.78 MW of battery storage capacity. The project has been mentioned in recent news coverage related to deals.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Cameron
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
SBESS TX25 LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 138kV #80309 Las Pulgas - #8319 Rio Hondo
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_SOUTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Rio
Data-driven briefing on Rio — fleet, generation, financial, and news signals.
Rio Hondo BESS
Data-driven briefing on Rio Hondo BESS — fleet, generation, financial, and news signals.
Rio Hondo
Data-driven briefing on Rio Hondo — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.