Query
Rio Hondo
Type
Entity Briefing
Entity
Rio Hondo
Summary generated
Oct 20, 2026
First saved
Date not recorded

Briefing on Rio Hondo

Entity Briefing

Summary generated Oct 20, 2026 (UTC).

Source dates used by this summary were not recorded.

2 MW
Capacity
Operating
Current status
1984
Operating since
1
Generators
0.0%
Capacity factor
0 GWh
Annual generation
Briefing/plantOperating

Rio Hondo is a 2 MW Conventional Hydroelectric asset in CAISO (California), currently Operating.

Rio Hondo is reported in California since 1984 under Metropolitan Water District of S CA. Available operating and financial measures include 0.0% capacity factor and 0 GWh annual generation; $2294/kW reported CapEx.

Location
Los Angeles, California
Technology
Conventional Hydroelectric
Owner / parent
Metropolitan Water District of S CA
Operator
Metropolitan Water District of S CA
Grid
CAISO (California)
Plant ID
482

What stands out

1

Rio Hondo is a 2 MW Conventional Hydroelectric asset in California with status Operating.

2

Latest annual operating measures report 0.0% capacity factor and 0 GWh annual generation.

3

Available financial measures include $2294/kW CapEx.

Market and operating context

ISO / market
CAISO (California)
Balancing authority
California Independent System Operator
NERC region
WECC
State rank
#220 of 247
National rank
#1234 of 1,462

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.