Briefing/projectactive
Rio Hondo BESS is a 201 MW Battery project in Texas, currently active.
SBESS TX25 LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-06-30.
- Queue ID
- ERCOT-26INR0461
- Location
- Cameron, Texas
- Technology
- Battery
- Developer
- SBESS TX25 LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 138kV #80309 Las Pulgas - #8319 Rio Hondo
What stands out
1
Rio Hondo BESS is a 201 MW Battery project in Texas with status active.
2
SBESS TX25 LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2028-06-30.
Market and operating context
- Queue date
- 2024-05-09
- Proposed COD
- 2028-06-30
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.