Query
Rio Hondo BESS
Type
Entity Briefing
Entity
Rio Hondo BESS
State
TN
Technology
battery
Generated
2026-10-06T22:08:40.032Z

Briefing on Rio Hondo BESS

Entity Briefing
Generated Oct 6, 2026·Dataset freshness not reported
201 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2028-06-30
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Rio Hondo BESS is a 201 MW Battery project in Texas, currently active.

SBESS TX25 LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-06-30.

Queue ID
ERCOT-26INR0461
Location
Cameron, Texas
Technology
Battery
Developer
SBESS TX25 LLC
Market / region
ERCOT
Point of interconnection
Tap 138kV #80309 Las Pulgas - #8319 Rio Hondo

What stands out

1

Rio Hondo BESS is a 201 MW Battery project in Texas with status active.

2

SBESS TX25 LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-06-30.

Market and operating context

Queue date
2024-05-09
Proposed COD
2028-06-30
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Rio Hondo BESS — verified asset snapshot

FieldValue
Queue IDERCOT-26INR0461
LocationCameron, Texas
TechnologyBattery
DeveloperSBESS TX25 LLC
Market / regionERCOT
Point of interconnectionTap 138kV #80309 Las Pulgas - #8319 Rio Hondo
Queue date2024-05-09
Proposed COD2028-06-30