Pleiades Storage
205.5 MW storage in Glasscock, TX · In queue since March 2024 · Proposed COD September 2029
205.5 MW
Capacity
1
Components
Battery
2y 8m
In Queue
Facility Study
IA Phase
COD target: 2029
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
5y 6m
Interconnection request submitted to ISO/RTO
SS Completed, FIS Completed, No IA
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-09-22
Projected COD moved
3 times
Jun 2027 → Sep 2029
Net change
+27 months
first report to latest
Capacity
206 MW
unchanged in the reports
Latest stage
Facilities study done
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.
Milestones in this assessment
ERCOT queue entry submitted, Facility Study phase
cleanview.coResearch sources and reasoning (4 recorded sources)
low confidence at research time
- cleanview.co/power-projects/planned/battery-storage-projects/texas/26INR0355/pleiades-storage
- infrasure.ai/project/ercot-26inr0355-pleiades-storage
- ercotqueue.com/project/26INR0355
- interconnection.fyi/projects/state/TX
Commercial operation date: LBNL queue filing shows proposed COD of September 2028. No independent news sources or press releases found to validate or contradict this date. Multiple aggregator sites (Cleanview, InfraSure, ercotqueue.com) echo the LBNL data but provide no original reporting.
Developer: Only source is LBNL filing entity 'Pleiades Storage, LLC'. No press releases, corporate announcements, or news coverage found to identify a parent company or operating entity. The LLC appears to be a single-purpose project vehicle with no public web presence or known parent affiliation.
Status: LBNL status is 'active' with IA status at Facility Study stage. No news coverage or developer announcements found to provide ground-truth updates on permitting, financing, or construction timeline.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Pleiades Storage, LLC is proposing a 205.5 MW battery storage project in Glasscock County, Texas. The project, identified as ERCOT-26INR0355 in the ERCOT interconnection queue, entered the queue on March 22, 2024, with a proposed commercial operation date of September 22, 2028. The project's interconnection status is currently in the Facility Study phase.
The proposed project consists of 205.5 MW of battery storage. The point of interconnection is Tap 138kV Einstein 23852 - 10043 St. Lawrence. The project is listed as active in the ERCOT queue.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Glasscock
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Pleiades Storage, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 138kV Einstein 23852 - 10043 St. Lawrence
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_WEST
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Pleiades Storage
Data-driven briefing on Pleiades Storage — fleet, generation, financial, and news signals.
Battery storage projects in ERCOT
Data tables and metrics from the InfraSure database.
Battery storage pipeline in ERCOT
Data tables and metrics from the InfraSure database.
Battery storage projects in ERCOT
Data tables and metrics from the InfraSure database.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.