Query
Pleiades Storage
Type
Entity Briefing
Entity
Pleiades Storage
Generated
2026-10-20T00:00:04.989Z

Briefing on Pleiades Storage

Entity Briefing
Generated Oct 20, 2026·Dataset freshness not reported
206 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2028-09-22
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Pleiades Storage is a 206 MW Battery project in Texas, currently active.

Pleiades Storage, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-09-22.

Queue ID
ERCOT-26INR0355
Location
Glasscock, Texas
Technology
Battery
Developer
Pleiades Storage, LLC
Market / region
ERCOT
Point of interconnection
Tap 138kV Einstein 23852 - 10043 St. Lawrence

What stands out

1

Pleiades Storage is a 206 MW Battery project in Texas with status active.

2

Pleiades Storage, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-09-22.

Market and operating context

Queue date
2024-03-22
Proposed COD
2028-09-22
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Pleiades Storage — verified asset snapshot

FieldValue
Queue IDERCOT-26INR0355
LocationGlasscock, Texas
TechnologyBattery
DeveloperPleiades Storage, LLC
Market / regionERCOT
Point of interconnectionTap 138kV Einstein 23852 - 10043 St. Lawrence
Queue date2024-03-22
Proposed COD2028-09-22