Elm Flats Solar SLF
125.58 MW hybrid in Navarro, TX · In queue since July 2024 · Proposed COD November 2027
125.58 MW
Capacity
1
Components
Solar
2y 4m
In Queue
Facility Study
IA Phase
COD target: 2027
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
3y 4m
Interconnection request submitted to ISO/RTO
SS Completed, FIS Started, IA
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-11-01
Projected COD moved
4 times
Jan 2026 → Nov 2027
Net change
+22 months
first report to latest
Capacity
126 → 126 MW
changed in the reports
Latest stage
IA signed
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.
Milestones in this assessment
Amendment No. 1 to Standard Generation Interconnection Agreement filed with Oncor Electric Delivery
interchange.puc.texas.govResearch sources and reasoning (4 recorded sources)
medium confidence at research time
- cleanview.co/power-projects/developers/birch-creek
- interchange.puc.texas.gov/search/filings/?UtilityType=E&ControlNumber=35077&DocumentType=ALL&SortBy=FilingParty&SortOrder=Ascending
- interconnection.fyi/project/ercot-26inr0130
- ercotqueue.com/project/26INR0130
Commercial operation date: Only LBNL queue snapshot provides a COD target of September 2027. No news or press releases found to confirm or update this date.
Developer: LBNL filing entity is 'Orca Falls Solar, LLC' (project-specific LLC). Cleanview database lists this project under Birch Creek's development pipeline, identifying Birch Creek as the parent developer with 28 projects totaling 2,241 MW.
Status: LBNL status is 'active' at Facility Study stage. Texas PUC Interchange shows recent filings (November-December 2025) for Standard Generation Interconnection Agreement amendments with Oncor, confirming active development.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Elm Flats Solar SLF project is a proposed solar generation facility with a total capacity of 125.58 MW. Located in Navarro County, Texas, the project is being developed by Elm Flats Solar, LLC. It is currently active in the ERCOT interconnection queue as entry ERCOT-26INR0130, with a queue entry date of July 30, 2024.
The proposed commercial operation date for the Elm Flats Solar SLF project is September 30, 2027. Its interconnection status is currently in the Facility Study phase. The point of interconnection is Tap 138kV 3472 BRIAR_CRK_8 _x0013_ 3467 POWELL1_8.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Navarro
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Orca Falls Solar, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 138kV 3472 BRIAR_CRK_8 – 3467 POWELL1_8
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Elm Flats Solar SLF
Data-driven briefing on Elm Flats Solar SLF — fleet, generation, financial, and news signals.
Elm Flats Solar
Data-driven briefing on Elm Flats Solar — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.