Query
Elm Flats Solar SLF
Type
Entity Briefing
Entity
Elm Flats Solar SLF
Generated
2026-10-19T05:33:51.560Z

Briefing on Elm Flats Solar SLF

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
126 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2027-09-30
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Elm Flats Solar SLF is a 126 MW Solar+Battery project in Texas, currently active.

Orca Falls Solar, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-09-30.

Queue ID
ERCOT-26INR0130
Location
Navarro, Texas
Technology
Solar+Battery
Developer
Orca Falls Solar, LLC
Market / region
ERCOT
Point of interconnection
Tap 138kV 3472 BRIAR_CRK_8 – 3467 POWELL1_8

What stands out

1

Elm Flats Solar SLF is a 126 MW Solar+Battery project in Texas with status active.

2

Orca Falls Solar, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2027-09-30.

Market and operating context

Queue date
2024-07-30
Proposed COD
2027-09-30
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Elm Flats Solar SLF — verified asset snapshot

FieldValue
Queue IDERCOT-26INR0130
LocationNavarro, Texas
TechnologySolar+Battery
DeveloperOrca Falls Solar, LLC
Market / regionERCOT
Point of interconnectionTap 138kV 3472 BRIAR_CRK_8 – 3467 POWELL1_8
Queue date2024-07-30
Proposed COD2027-09-30