Briefing/plantUnder construction
Elm Flats Solar is a 175 MW Batteries asset in ERCOT (Texas), currently Under construction.
Elm Flats Solar is reported in Texas under Birch Creek Development. Available operating and financial measures include $1361/kW reported CapEx.
- Location
- Navarro, Texas
- Technology
- Batteries, Solar Photovoltaic
- Owner / parent
- Birch Creek Development
- Operator
- Birch Creek Development
- Grid
- ERCOT (Texas)
- Plant ID
- 67552
What stands out
1
Elm Flats Solar is a 175 MW Batteries asset in Texas with status Under construction.
2
Available financial measures include $1361/kW CapEx.
Market and operating context
- ISO / market
- ERCOT (Texas)
- Balancing authority
- Electric Reliability Council of Texas, Inc.
- NERC region
- TRE
- State rank
- #185 of 378
- National rank
- #478 of 7,971
Why it matters
For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.