Amerada Solar
301.57 MW hybrid in Freestone, TX · In queue since May 2023 · Proposed COD December 2028
301.57 MW
Capacity
1
Components
Solar
3y 6m
In Queue
Facility Study
IA Phase
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
5y 7m
Interconnection request submitted to ISO/RTO
SS Completed, FIS Started, No IA
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-12-30
Projected COD moved
3 times
Oct 2026 → Dec 2028
Net change
+26 months
first report to latest
Capacity
302 MW
unchanged in the reports
Latest stage
Screening started
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (6 recorded sources)
low confidence at research time
- infrasure.ai/project/ercot-26inr0084-amerada-storage
- infrasure.ai/project/ercot-26inr0082-amerada-solar
- ercotqueue.com/project/26INR0082
- ercotqueue.com/project/26INR0084
- interconnection.fyi/project/ercot-26inr0082
- cleanview.co/power-projects/planned/solar-farms/texas/26INR0082/amerada-solar
Commercial operation date: No developer press release or news gives a financing-backed date. Aggregators mirror the queue data: the companion storage project (26INR0084) shows a July 2028 proposed COD, and Cleanview lists 'Expected online 2028' for this project. The LBNL date of 2028-12-30 is retained.
Developer: Every source (infrasure.ai, ercotqueue.com, interconnection.fyi, GridStatus) names Amerada Solar, LLC, and they all derive from the ERCOT queue filing. No parent or operating company has been identified publicly.
Status: LBNL status is 'active' and the aggregators (interconnection.fyi, infrasure.ai) confirm it is still active in the ERCOT queue. Nothing indicates withdrawal, construction, or an executed IA.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Amerada Solar is a proposed solar generation project located in Freestone County, Texas, within the ERCOT region. The project, developed by Amerada Solar, LLC, has a total capacity of 301.57 MW. It consists entirely of solar photovoltaic generation.
The project is listed in the ERCOT interconnection queue as entry ERCOT-26INR0082, with a queue entry date of May 15, 2023, and a proposed commercial operation date of December 30, 2028. Its interconnection status is currently in the Facility Study phase. The project is linked to the existing Amerada operating plant (EIA ID 67649).
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Freestone
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Amerada Solar, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 345kV 3133 RICHLND2_5 - 3381 BIGBRNW_5
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- FREC
- POI Substation
- Richland Chambers Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
TOCE TX BESS 2
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Texas energy overview
Summary analysis with parallel narrative sections and visualizations.
State-by-state breakdown for ERCOT (Texas)
Summary analysis with parallel narrative sections and visualizations.
Queue projects in Texas
Data tables and metrics from the InfraSure database.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.