Amerada Storage (ERCOT-26INR0084) — Project Summary

Queue ID
ERCOT-26INR0084
Capacity
150.78 MW
Technology
Solar+Battery
Status
active
Location
Freestone, TX
Region
ERCOT
Developer
Amerada Solar, LLC
IA Status
Facility Study

Amerada Storage

ERCOT-26INR0084BetaActiveBatteryBatteryERCOTLBNL + Live

150.78 MW generation in Freestone, TX · In queue since May 2023 · Proposed COD July 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

150.78 MW

Capacity

1

Components

Battery

3y 6m

In Queue

Facility Study

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

5y 2m

Facilities Study50%
Queue EntryMay 15, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-07-21

Queue history
26INR0084 · 41 monthly ERCOT reports, May 2023 – Sep 2026

Projected COD moved

2 times

Oct 2026 → Jul 2028

Net change

+21 months

first report to latest

Capacity

151 MW

unchanged in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedMay 15, 2023

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
Jul 2028
Developer in saved assessment
Amerada Solar, LLC
From queue filing
Status at research time
Active
Active — Facility Study stage, no IA executed. Build probability assessed at 5% by ercotqueue.com due to early interconnection stage.
Financing
Not recorded

Milestones in this assessment

COD targetAug 22, 2027

Proposed completion changed from October 21, 2026 to August 22, 2027

interconnectionfyi.substack.com
COD targetJul 20, 2028Latest in this assessment

Proposed completion date updated to July 20, 2028 (previously August 22, 2027)

interconnectionfyi.substack.com
Research sources and reasoning (6 recorded sources)

medium confidence at research time

  1. interconnection.fyi/project/ercot-26inr0084
  2. renewablesinfo.org/project/ercot-26inr0084-amerada-storage
  3. interconnectionfyi.substack.com/p/interconnectionfyi-weekly-digest
  4. interconnectionfyi.substack.com/p/interconnection-weekly-project-updates-ad5
  5. ercotqueue.com/project/26INR0084
  6. ercotqueue.com/developer/amerada-solar-llc

Commercial operation date: LBNL proposed COD of 2028-07-21 aligns with the most recent interconnection.fyi update (April 2025) showing 'Proposed completion changed to July 20, 2028'. No contradictory signals found in research.

Developer: All sources consistently identify 'Amerada Solar, LLC' as both the filing entity and operating developer. No evidence of shell-LLC structure or parent company differentiation found in any research.

Status: LBNL status 'active' confirmed by multiple queue-tracking sources. Project remains in Facility Study phase with no interconnection agreement as of April 2025.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Amerada Storage project is a proposed 150.78 MW battery energy storage system located in Freestone County, Texas. The project, being developed by Amerada Solar, LLC, is interconnected within the Electric Reliability Council of Texas (ERCOT) region. It entered the ERCOT interconnection queue as project ERCOT-26INR0084 on May 15, 2023, with a proposed commercial operation date of July 21, 2028. The project's interconnection status is currently in the Facility Study phase.

The point of interconnection for the Amerada Storage project is Tap 345kV 3133 RICHLND2_5 - 3381 BIGBRNW_5. Recent news coverage has discussed the development project.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Freestone

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Amerada Solar, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 345kV 3133 RICHLND2_5 - 3381 BIGBRNW_5

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
MEDIUM
Nearest Node (Estimated)
FREC
POI Substation
Richland Chambers Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.