Timmerman Power Plant Phase 2
188.4 MW generation in Caldwell, TX · In queue since September 2023 · Proposed COD May 2026
188.4 MW
Capacity
1
Components
Gas
3y 2m
In Queue
IA Executed
IA Phase
Signed Dec 2023
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Queue → IA
3 months
IA → COD
2y 5m
Total Duration
3 months
Schedule
6 months past proposed COD
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 24–48 months
Proposed COD: 2026-05-29
Projected COD moved
6 times
Feb 2026 → Apr 2026
Net change
+2 months
first report to latest
Capacity
188 MW
unchanged in the reports
Latest stage
Commercial operation
last listed Mar 2026
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.
Milestones in this assessment
Interconnection Agreement executed per LBNL queue data
texasborderbusiness.comPUCT executed first TxEF Completion Bonus Grant agreement for Phase 2
powermag.comPlant came fully online one month ahead of May 2026 target
texasborderbusiness.comResearch sources and reasoning (4 recorded sources)
high confidence at research time
- texasborderbusiness.com/timmerman-power-plant-comes-fully-online-one-month-early/
- powermag.com/texas-issues-first-performance-based-grant-under-energy-fund-for-lcras-new-188-mw-rice-peaker/
- austinmonitor.com/stories/2024/04/lcra-ups-its-peaker-power/
- powermag.com/texas-moves-forward-with-5-38b-in-loans-for-10-gw-of-new-dispatchable-power-projects/
Commercial operation date: Texas Border Business reports the plant 'came fully online one month early' approximately 1 month ago (May 2026), indicating actual COD in April 2026 vs. LBNL's proposed May 29, 2026. This represents early completion rather than delay.
Developer: LBNL filing entity 'Lower Colorado River Authority' matches all press coverage and is the actual operating utility, not a shell LLC. No ownership changes detected.
Status: Texas Border Business and POWER Magazine confirm the 188-MW RICE peaker is now fully operational as of April 2026, with PUCT executing the first TxEF Completion Bonus Grant agreement in November 2025.
About
Generated Apr 10, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Uhland Maxwell Expansion is a proposed 188.4 MW gas-fired generation project located in Caldwell County, Texas. The developer is Lower Colorado River Authority. It is interconnected within the ERCOT region under queue ID ERCOT-25INR0503, with a queue entry date of September 22, 2023, and a proposed commercial operation date of April 30, 2026.
The project's Interconnection Agreement (IA) has been executed as of December 28, 2023. The point of interconnection (POI) is the 7041 John Dumas 345kV substation.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
- Queue history observations through: Mar 2026.
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Caldwell
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Lower Colorado River Authority
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
7041 John Dumas 345kV
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_SOUTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Timmerman Power Plant
Data-driven briefing on Timmerman Power Plant — fleet, generation, financial, and news signals.
Lower No 1
Data-driven briefing on Lower Colorado River Authority — fleet, generation, financial, and news signals.
Timmerman Power Plant Phase 2
Data-driven briefing on Timmerman Power Plant Phase 2 — fleet, generation, financial, and news signals.
Lower No 2
Data-driven briefing on Lower Colorado River Authority — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.