Briefing/owner12 operating assets · 2 queue projects
Lower Colorado River Authority includes 3.7 GW of operating capacity and 283 MW of proposed queue capacity in the current result.
12 operating plants span 1 states. The linked queue contains 2 projects totaling 283 MW. Hydroelectric is the largest operating technology group at 290 MW.
- Coverage
- 12 plants across 1 states
- Largest asset
- Sandy Creek Energy Station · 1 GW
- Leading technology
- Hydroelectric · 290 MW
- Queue pipeline
- 2 projects · 283 MW
What stands out
1
12 operating plants total 3.7 GW across 1 states.
2
Hydroelectric is the largest operating technology group at 290 MW across 6 plants.
3
Sandy Creek Energy Station is the largest returned operating asset at 1 GW.
4
2 queue projects total 283 MW of proposed capacity.
Market and operating context
- Largest state footprint
- Texas · 3.7 GW
- Technology concentration
- Hydroelectric represents 290 MW
- Development pipeline
- 2 projects · 283 MW
Why it matters
The operating footprint shows what exists today, while the queue pipeline and latest curated events show where the portfolio or market may be changing. Reading those layers together avoids treating proposed capacity as operating capacity.