Briefing on Timmerman Power Plant Phase 2

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
188 MW
Proposed capacity
active
Current status
Gas
Technology
ERCOT
Market / region
2026-05-29
Proposed COD
IA Executed
Queue phase
Briefing/projectactive

Timmerman Power Plant Phase 2 is a 188 MW Gas project in Texas, currently active.

Lower Colorado River Authority is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2026-05-29.

Queue ID
ERCOT-25INR0503
Location
Caldwell, Texas
Technology
Gas
Developer
Lower Colorado River Authority
Market / region
ERCOT
Point of interconnection
7041 John Dumas 345kV

What stands out

1

Timmerman Power Plant Phase 2 is a 188 MW Gas project in Texas with status active.

2

Lower Colorado River Authority is the reported developer.

3

The reported queue phase is IA Executed; proposed COD is 2026-05-29.

Market and operating context

Queue date
2023-09-22
Proposed COD
2026-05-29
IA status
IA Executed
Study phase
IA Executed

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Timmerman Power Plant Phase 2 — verified asset snapshot

FieldValue
Queue IDERCOT-25INR0503
LocationCaldwell, Texas
TechnologyGas
DeveloperLower Colorado River Authority
Market / regionERCOT
Point of interconnection7041 John Dumas 345kV
Queue date2023-09-22
Proposed COD2026-05-29