LOS ESTEROS CRITICAL ENERGY FACILITY EXPANSION
123 MW hybrid in Santa Clara, CA · In queue since May 2008 · Proposed COD September 2023
123 MW
Capacity
2
Components
Gas + Battery
18y 6m
In Queue
IA Executed
IA Phase
Signed Apr 2011
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Queue → IA
2y 11m
IA → COD
12y 5m
Total Duration
2y 11m
Schedule
39 months past proposed COD
Study Phase
TC
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Active sheet; IA Executed; TC
Project under construction
Typical: 6–18 months
Proposed COD: 2023-09-01
From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Milestones in this assessment
Interconnection Agreement executed between Calpine and CAISO for the 123 MW battery expansion at Los Esteros 115 kV substation
infrasure.aiProposed commercial operation date per CAISO queue filing — date has lapsed; project remains non-operational
infrasure.aiResearch sources and reasoning (8 recorded sources)
low confidence at research time
- efiling.energy.ca.gov/GetDocument.aspx?tn=54337&DocumentContentId=50396
- energy.ca.gov/powerplant/combined-cycle/los-esteros-critical-energy-facility
- infrasure.ai/project/caiso-378-los-esteros-critical-energy-facility-expansion
- interconnection.fyi/project/caiso-378
- interxdata.com/projects/los-esteros-critical-energy-facility-expansion-caiso-public-queue-378/
- cleanview.co/power-projects/planned/natural-gas-power-plants/california
- docs.cpuc.ca.gov/PublishedDocs/Efile/G000/M534/K048/534048570.PDF
- powermag.com/pge-smart-wires-enhance-grid-reliability-capacity-for-california-data-centers/
Commercial operation date: Only the LBNL queue snapshot provides a COD target (2023-09-01); that date has lapsed and LBNL confirms is_operational=false. No public source offers a revised forward-looking COD, suggesting the project is stalled rather than advancing to a new target date.
Developer: LBNL lists no developer (null); the CAISO Transition Cluster Interconnection Study Report on the CEC e-filing portal explicitly identifies 'Calpine Corporation' as the Interconnection Customer for this project, consistent with Calpine's long-standing ownership and operation of the underlying Los Esteros Critical Energy Facility combined-cycle plant in Santa Clara.
Status: LBNL flags the project as 'active' with is_operational=false; multiple independent queue trackers (interconnection.fyi, interxdata.com, cleanview.co, infrasure.ai) corroborate active status through 2024-2025 with no withdrawal notice detected.
About
Generated Apr 10, 2026 · Predates Oct 24, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Los Esteros Critical Energy Facility Expansion is a proposed hybrid project located in Santa Clara County, California, with a total capacity of 123 MW. The project, which has appeared in recent news, consists of a 120 MW gas component and a 3 MW battery component. It is interconnected to the CAISO grid under queue ID CAISO-378 and is linked to an existing operating plant.
The project entered the CAISO interconnection queue on May 28, 2008, with a proposed commercial operation date of September 1, 2023. An Interconnection Agreement (IA) was executed on April 4, 2011. The project's point of interconnection (POI) is the Los Esteros 115 kV substation, and the interconnecting utility is PG&E.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- CAISO queue source as of: Oct 24, 2026.
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
CA
County
Santa Clara
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
PGAE
Entity
CAISO
Service Type
NRIS
Point of Interconnection
Los Esteros 115 kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- CAISO
- Trading Hub
- TH_ZP26_GEN-APND
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- LECEFGT2_7_B1
- POI Substation
- Los Esteros Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-04-09
View all articlesForward forecasts, scenario decomposition, and risk-decision tooling for this queue project.