Query
LOS ESTEROS CRITICAL ENERGY FACILITY EXPANSION
Type
Entity Briefing
Entity
LOS ESTEROS CRITICAL ENERGY FACILITY EXPANSION
Generated
2026-10-12T00:27:45.342Z

Briefing on LOS ESTEROS CRITICAL ENERGY FACILITY EXPANSION

Entity Briefing
Generated Oct 12, 2026·Dataset freshness not reported
123 MW
Proposed capacity
active
Current status
Battery
Technology
CAISO
Market / region
2023-09-01
Proposed COD
TC
Queue phase
Briefing/projectactive

LOS ESTEROS CRITICAL ENERGY FACILITY EXPANSION is a 123 MW Battery project in California, currently active.

The reported queue phase is TC. Proposed COD is 2023-09-01.

Queue ID
CAISO-378
Location
Santa Clara, California
Technology
Battery
Market / region
CAISO
Point of interconnection
Los Esteros 115 kV

What stands out

1

LOS ESTEROS CRITICAL ENERGY FACILITY EXPANSION is a 123 MW Battery project in California with status active.

2

The reported queue phase is TC; proposed COD is 2023-09-01.

3

Latest linked story: “PG&E, Smart Wires Enhance Grid Reliability, Capacity for California Data Centers” (POWER Magazine, 2025-05-29).

Market and operating context

Queue date
2008-05-28
Proposed COD
2023-09-01
IA status
IA Executed
Study phase
TC
Service type
NRIS

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

LOS ESTEROS CRITICAL ENERGY FACILITY EXPANSION — verified asset snapshot

FieldValue
Queue IDCAISO-378
LocationSanta Clara, California
TechnologyBattery
Market / regionCAISO
Point of interconnectionLos Esteros 115 kV
Queue date2008-05-28
Proposed COD2023-09-01
IA statusIA Executed