Briefing/projectactive
LOS ESTEROS CRITICAL ENERGY FACILITY EXPANSION is a 123 MW Battery project in California, currently active.
The reported queue phase is TC. Proposed COD is 2023-09-01.
- Queue ID
- CAISO-378
- Location
- Santa Clara, California
- Technology
- Battery
- Market / region
- CAISO
- Point of interconnection
- Los Esteros 115 kV
What stands out
1
LOS ESTEROS CRITICAL ENERGY FACILITY EXPANSION is a 123 MW Battery project in California with status active.
2
The reported queue phase is TC; proposed COD is 2023-09-01.
3
Latest linked story: “PG&E, Smart Wires Enhance Grid Reliability, Capacity for California Data Centers” (POWER Magazine, 2025-05-29).
Market and operating context
- Queue date
- 2008-05-28
- Proposed COD
- 2023-09-01
- IA status
- IA Executed
- Study phase
- TC
- Service type
- NRIS
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.