TYRELL ENERGY STORAGE
302.4 MW storage in Orange, CA · In queue since April 2021 · Proposed COD May 2032
302.4 MW
Capacity
1
Components
Battery
5y 7m
In Queue
IA Executed
IA Phase
Signed Sep 2025
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Queue → IA
4y 5m
IA → COD
6y 8m
Total Duration
4y 5m
Study Phase
C14
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Active sheet; IA Executed; C14
Project under construction
Typical: 6–18 months
Proposed COD: 2032-05-26
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Milestones in this assessment
Interconnection agreement executed per LBNL queue data; the aggregator page confirms active queue status.
interconnection.fyiResearch sources and reasoning (4 recorded sources)
low confidence at research time
- interconnection.fyi/project/caiso-2125
- cleanview.co/power-projects/planned/battery-storage-projects/california/2125_storage/tyrell-energy-storage
- infrasure.ai/project/caiso-2125-tyrell-energy-storage
- app.nrgmap.com/queues/caiso-2125
Commercial operation date: Only queue-derived sources (LBNL, Cleanview, interconnection.fyi) show the 2032-05-26 proposed COD; they appear to be aggregators repeating the CAISO filing, not independent developer-backed signals. No press release or news gives a different target.
Developer: LBNL developer field is null and no search result names a developer or parent for Tyrell Energy Storage. The Deriva/Frontier 302-MW result is an Oklahoma SPP project and unrelated.
Status: LBNL lists status active with IA Executed dated 2025-09-24, and NRG Map and other aggregators confirm it is still active. No evidence of withdrawal or construction start.
About
Generated Apr 10, 2026 · Predates Oct 24, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The proposed TYRELL ENERGY STORAGE project is a 302.4 MW battery storage development in Orange County, California. It is located within the CAISO region and is interconnected with Southern California Edison (SCE) at the Viejo Substation 230kV.
The project is listed in the CAISO interconnection queue as queue ID CAISO-2125, with an entry date of April 15, 2021. Its proposed commercial operation date is May 26, 2032. The project's interconnection status is currently in the System Impact Study phase.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- CAISO queue source as of: Oct 24, 2026.
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
CA
County
Orange
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
SCE
Entity
CAISO
Service Type
NRIS
Point of Interconnection
Viejo Substation 230kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- CAISO
- Trading Hub
- TH_SP15_GEN-APND
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- VIEJOSC_2_N004
- POI Substation
- Viejo Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Battery storage queue pipeline
Summary analysis with parallel narrative sections and visualizations.
Battery Storage queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
TYRELL ENERGY STORAGE Battery Storage queue pipeline — 1 projects by technology and status
Data-driven briefing on TYRELL ENERGY STORAGE — fleet, generation, financial, and news signals.
TYRELL ENERGY STORAGE
Data-driven briefing on TYRELL ENERGY STORAGE — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.