Search plants, projects, owners, and states
20 MW BESS operating in Sussex, NJ
20 MW
Nameplate Capacity
1
Generators
unit
Batteries
Technology
2023
Operating Since
Coordinates
40.9808, -74.7609
County
Sussex, NJ
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | VESI 25 LLC | — | — |
| Owner(s) | VESI 25 LLC | — | — |
| Status | Operating | — | — |
The Andover Energy Storage Project is a 20 MW battery energy storage system (BESS) located in Sussex County, New Jersey. The plant, which began operating in 2023, is owned and operated by VESI 25 LLC. It utilizes lithium-ion battery chemistry (LIB) and has a total storage capacity of 20 MWh, providing a duration of 1 hour at full output. The facility consists of a single generator and is interconnected within the PJM Interconnection, LLC balancing authority, falling within the RFC NERC region.
The Andover Energy Storage Project is ranked as the 3rd largest of 10 energy storage facilities in New Jersey, and 688th nationally out of 1205 similar plants. The plant's primary fuel is listed as "MWH," indicating that it draws power from the grid to charge its batteries.
Generated from EIA, GEM, and public data sources
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
34.5 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
−376 MWh
Net Charging
-4.5K MWh
Annual Net Energy
-2.6%
Capacity Factor
Positive values indicate net discharge (generation exceeds station load). Negative values indicate net charging. Pure battery storage plants are typically net negative due to round-trip efficiency losses.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2023
$1,361/kW
Est. Construction Cost
Total estimated cost: $27.2M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Andover Substation · 35 kV
Substation Distance
< 10 km
Operator
Jersey Central Power and Light
Coord Source
OSM spatial
Market Position
ISO/RTO Market
PJM
LMP Node
—
Pricing Hub
WESTERN HUB
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Andover Energy Storage ProjectForward forecasts, scenario decomposition, and risk-decision tooling for this asset.