Andover Energy Storage Project is a 20 MW Batteries asset in PJM Interconnection, currently Operating.
Andover Energy Storage Project is reported in New Jersey since 2023 under VESI 25 LLC. Available operating and financial measures include -2.6% capacity factor and -5 GWh annual generation; $1361/kW reported CapEx.
- Location
- Sussex, New Jersey
- Technology
- Batteries
- Owner / parent
- VESI 25 LLC
- Operator
- VESI 25 LLC
- Grid
- PJM Interconnection
- Plant ID
- 65952
What stands out
Andover Energy Storage Project is a 20 MW Batteries asset in New Jersey with status Operating.
Latest annual operating measures report -2.6% capacity factor and -5 GWh annual generation.
Available financial measures include $1361/kW CapEx.
Market and operating context
- ISO / market
- PJM Interconnection
- Balancing authority
- PJM Interconnection, LLC
- NERC region
- RFC
- State rank
- #1 of 10
- National rank
- #532 of 994
Why it matters
For this asset in PJM Interconnection, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.