20 MW BESS under construction in Monroe, TN
20 MW
Nameplate Capacity
1
Generators
unit
Batteries
Technology
—
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Plant reference point
35.6157, -84.2763
Reference point calculated from the selected footprint.
Mapped site outline
Site outline mapped in OpenStreetMap. It is not a surveyed or legal boundary.
County
Monroe, TN
Nearby Plants
The starting substation is nearby, but its connection to this plant is unconfirmed.
2 mapped line sections connect the two facilities over 1.748 km. At least one endpoint uses a nearby spatial match.
The actual electrical circuit, the official point of interconnection (POI), and the market settlement node require separate evidence.
Source checked 26 Oct 2026. Facility colors and shapes indicate source-reported function, not ownership or a confirmed plant connection.
This release uses a national source capture. Coverage and electrical detail vary by location; missing map data does not mean there is no connection. Lettered substation names are display labels where the source has no name. They do not identify ownership or function.
Source snapshot: 25 Oct 2026.
Reverse views of the same physical route are grouped in the route selector. All source records are retained.
Method: source-node-path-v2 · Release: gcr-73c6ce9c596ada3ec63d5523
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Tennessee Valley Authority | Tennessee Valley Authority | — |
| Owner(s) | Tennessee Valley Authority | Tennessee Valley Authority | — |
| Status | Under construction | — | — |
Summary generated Mar 22, 2026 (UTC).
Source dates used by this summary were not recorded.
These may postdate the saved summary; they do not establish which inputs it used.
The Vonore Battery Energy Storage System is a 20 MW battery energy storage facility located in Monroe County, Tennessee. The plant, identified by plant ID 64255, is owned and operated by the Tennessee Valley Authority (TVA). It consists of a single generator utilizing battery technology and reports its primary fuel as MWH (megawatt-hours). The facility operates within the Tennessee Valley Authority balancing authority area and the SERC NERC region.
The Vonore Battery Energy Storage System is ranked as the second-largest battery storage facility in Tennessee, out of a total of two such plants in the state. Nationally, it holds a rank of 681 out of 1205 battery storage facilities. Recent news coverage indicates a focus on grid-related topics, followed by industry and regulatory matters.
Grid Region
Southeast
Market
SEEM Participant
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
Tennessee Valley Authority (TVA)
Grid Voltage
13.0 kV
Regulatory Status
RE — Regulated
Entity Type
Federal
Sector
Electric Utility
Connection evidence
Mapped route candidate
No generation data available for this plant.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2023
$1,361/kW
Est. Construction Cost
Total estimated cost: $27.2M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in the Southeast Energy Exchange Market (SEEM). SEEM is a bilateral exchange — no public nodal pricing.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-26
View all articlesTop operators in Tennessee
Data tables and metrics from the InfraSure database.
SPC Bloom BESS
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Vonore Battery Energy Storage System
Data-driven briefing on Vonore Battery Energy Storage System — fleet, generation, financial, and news signals.
Coke BESS
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.