1.2 MW Hydro operating in Jerome, ID
1.2 MW
Nameplate Capacity
1
Generators
unit
Conventional Hydroelectric
Technology
2015
Operating Since
Coordinates
42.7628, -114.3958
County
Jerome, ID
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | North Side Energy Company | — | — |
| Owner(s) | North Side Energy Company | — | — |
| Status | Operating | — | — |
The Head of U Canal Hydro Project is a hydroelectric power plant located in Jerome County, Idaho. It is owned and operated by North Side Energy Company. The plant began operating in 2015 and has a total capacity of 1.2 MW from a single generator. The primary fuel source is water (WAT), utilizing conventional hydroelectric technology.
In the most recent year of reported data, the plant generated 4,546 MWh of electricity, achieving a capacity factor of 43.0%. The Head of U Canal Hydro Project operates within the Western Electricity Coordinating Council (WECC) NERC region and is under the balancing authority of the Idaho Power Company. Based on capacity, the plant ranks 73rd out of 76 power plants in Idaho and 1396th out of 1464 plants nationally.
Generated from EIA, GEM, and public data sources
Grid Region
Mountain West
Market
WEIM Participant
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
Idaho Power Company (IPCO)
Grid Voltage
12.5 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
0 MWh
Latest Month
4.5K MWh
Annual Generation
43.0%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2015
$580/kW
Est. Construction Cost
Total estimated cost: $696K
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in CAISO's Western Energy Imbalance Market (WEIM). Direct nodal pricing data is not yet available.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Head of U Canal Hydro ProjectForward forecasts, scenario decomposition, and risk-decision tooling for this asset.