Briefing/state158 operating assets · 83 queue projects
Idaho includes 7.5 GW of operating capacity and 21 GW of proposed queue capacity in the current result.
158 operating plants span 1 states. The linked queue contains 83 projects totaling 21 GW. Hydroelectric is the largest operating technology group at 2.7 GW.
- Coverage
- 158 plants across 1 states
- Largest asset
- Brownlee · 675 MW
- Leading technology
- Hydroelectric · 2.7 GW
- Queue pipeline
- 83 projects · 21 GW
What stands out
1
158 operating plants total 7.5 GW across 1 states.
2
Hydroelectric is the largest operating technology group at 2.7 GW across 76 plants.
3
Brownlee is the largest returned operating asset at 675 MW.
4
83 queue projects total 21 GW of proposed capacity.
Market and operating context
- Largest state footprint
- Idaho · 7.5 GW
- Technology concentration
- Hydroelectric represents 2.7 GW
- Development pipeline
- 83 projects · 21 GW
Why it matters
The operating footprint shows what exists today, while the queue pipeline and latest curated events show where the portfolio or market may be changing. Reading those layers together avoids treating proposed capacity as operating capacity.