Head of U Canal Hydro Project is a 1 MW Conventional Hydroelectric asset in Idaho, currently Operating.
Head of U Canal Hydro Project is reported in Idaho since 2015 under North Side Energy Company. Available operating and financial measures include 43.0% capacity factor and 5 GWh annual generation; $580/kW reported CapEx.
- Location
- Jerome, Idaho
- Technology
- Conventional Hydroelectric
- Owner / parent
- North Side Energy Company
- Operator
- North Side Energy Company
- Grid
- Idaho Power Company
- Plant ID
- 61217
What stands out
Head of U Canal Hydro Project is a 1 MW Conventional Hydroelectric asset in Idaho with status Operating.
Latest annual operating measures report 43.0% capacity factor and 5 GWh annual generation.
Available financial measures include $580/kW CapEx.
Market and operating context
- Balancing authority
- Idaho Power Company
- NERC region
- WECC
- State rank
- #72 of 76
- National rank
- #1387 of 1,462
Why it matters
For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.