Search plants, projects, owners, and states
6 MW Hydro operating in King, WA
6 MW
Nameplate Capacity
1
Generators
unit
Conventional Hydroelectric
Technology
2018
Operating Since
Coordinates
47.5722, -121.6897
County
King, WA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | PUD No 1 of Snohomish County - (WA) | — | — |
| Owner(s) | PUD No 1 of Snohomish County | — | — |
| Status | Operating | — | — |
The Hancock Creek Hydroelectric Project is a 6 MW conventional hydroelectric power plant located in King County, Washington. The plant began operating in 2018 and is owned and operated by PUD No 1 of Snohomish County. It utilizes one generator and its primary fuel source is water (WAT). The plant operates within the Puget Sound Energy balancing authority and the Western Electricity Coordinating Council (WECC) NERC region.
In its most recent year of operation, the Hancock Creek Hydroelectric Project generated 22,999 MWh of electricity, achieving a capacity factor of 43.6%. The plant is ranked as the 59th largest in Washington state out of 75 plants, and 817th nationally out of 1464 plants.
Generated from EIA, GEM, and public data sources
Grid Region
Pacific Northwest
Market
WEIM Participant
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
Puget Sound Energy (PSEI)
Grid Voltage
34.5 kV
Regulatory Status
RE — Regulated
Entity Type
Political Subdivision
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
3.0K MWh
Latest Month
23.0K MWh
Annual Generation
43.6%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2018
$5,312/kW
Est. Construction Cost
Total estimated cost: $31.9M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in CAISO's Western Energy Imbalance Market (WEIM). Direct nodal pricing data is not yet available.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Hancock Creek Hydroelectric ProjectForward forecasts, scenario decomposition, and risk-decision tooling for this asset.