Briefing/state152 operating assets · 207 queue projects
Washington includes 36.3 GW of operating capacity and 58.5 GW of proposed queue capacity in the current result.
152 operating plants span 1 states. The linked queue contains 207 projects totaling 58.5 GW. Hydroelectric is the largest operating technology group at 21.8 GW.
- Coverage
- 152 plants across 1 states
- Largest asset
- Grand Coulee · 6.8 GW
- Leading technology
- Hydroelectric · 21.8 GW
- Queue pipeline
- 207 projects · 58.5 GW
What stands out
1
152 operating plants total 36.3 GW across 1 states.
2
Hydroelectric is the largest operating technology group at 21.8 GW across 73 plants.
3
Grand Coulee is the largest returned operating asset at 6.8 GW.
4
207 queue projects total 58.5 GW of proposed capacity.
Market and operating context
- Largest state footprint
- Washington · 36.3 GW
- Technology concentration
- Hydroelectric represents 21.8 GW
- Development pipeline
- 207 projects · 58.5 GW
Why it matters
The operating footprint shows what exists today, while the queue pipeline and latest curated events show where the portfolio or market may be changing. Reading those layers together avoids treating proposed capacity as operating capacity.