Query
Hancock Creek Hydroelectric Project
Type
Entity Briefing
Entity
Hancock Creek Hydroelectric Project
Technology
hydro
Generated
2026-10-19T06:20:42.791Z

Briefing on Hancock Creek Hydroelectric Project

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
6 MW
Capacity
Operating
Current status
2018
Operating since
1
Generators
43.6%
Capacity factor
23 GWh
Annual generation
Briefing/plantOperating

Hancock Creek Hydroelectric Project is a 6 MW Conventional Hydroelectric asset in Washington, currently Operating.

Hancock Creek Hydroelectric Project is reported in Washington since 2018 under PUD No 1 of Snohomish County - (WA). Available operating and financial measures include 43.6% capacity factor and 23 GWh annual generation; $5312/kW reported CapEx.

Location
King, Washington
Technology
Conventional Hydroelectric
Owner / parent
PUD No 1 of Snohomish County - (WA)
Operator
PUD No 1 of Snohomish County - (WA)
Grid
Puget Sound Energy
Plant ID
60517

What stands out

1

Hancock Creek Hydroelectric Project is a 6 MW Conventional Hydroelectric asset in Washington with status Operating.

2

Latest annual operating measures report 43.6% capacity factor and 23 GWh annual generation.

3

Available financial measures include $5312/kW CapEx.

Market and operating context

Balancing authority
Puget Sound Energy
NERC region
WECC
State rank
#57 of 73
National rank
#825 of 1,462

Why it matters

For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.