173 MW Natural Gas operating in Hardin, TX
173 MW
Nameplate Capacity
2
Generators
units
Natural Gas Fired Combustion Turbine
Technology
2001
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Plant reference point
30.3038, -94.2525
Reference point calculated from the selected footprint.
Mapped site outline
Site outline mapped in OpenStreetMap. It is not a surveyed or legal boundary.
County
Hardin, TX
Nearby Plants
The starting substation is nearby, but its connection to this plant is unconfirmed.
1 mapped line section connects the two facilities over 0.336 km. At least one endpoint uses a nearby spatial match.
The actual electrical circuit, the official point of interconnection (POI), and the market settlement node require separate evidence.
Source checked 26 Oct 2026. Facility colors and shapes indicate source-reported function, not ownership or a confirmed plant connection.
This release uses a national source capture. Coverage and electrical detail vary by location; missing map data does not mean there is no connection. Lettered substation names are display labels where the source has no name. They do not identify ownership or function.
Source snapshot: 25 Oct 2026.
Reverse views of the same physical route are grouped in the route selector. All source records are retained.
Method: source-node-path-v2 · Release: gcr-73c6ce9c596ada3ec63d5523
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Entergy Texas Inc. | Entergy Texas | — |
| Owner(s) | Entergy Texas Inc. | Entergy | — |
| Status | Operating | — | — |
Summary generated Mar 21, 2026 (UTC).
Source dates used by this summary were not recorded.
These may postdate the saved summary; they do not establish which inputs it used.
The Hardin County Peaking Facility is a 173 MW natural gas-fired power plant located in Hardin County, Texas. The plant began operating in 2001 and consists of two natural gas-fired combustion turbine generators. It is owned by Entergy and operated by Entergy Texas Inc. The plant's installed cost was $458 per kW, according to FERC data.
The Hardin County Peaking Facility operates within the Midcontinent Independent Transmission System Operator (MISO) balancing authority and the SERC NERC region. In the most recent year of data, the plant generated 194,646 MWh of electricity, achieving a capacity factor of 12.8%. The plant ranks 126th out of 144 power plants in Texas and 784th out of 945 plants nationally.
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
230.0 kV
Regulatory Status
RE — Regulated
Entity Type
Investor-Owned Utility
Sector
Electric Utility
Connection evidence
Mapped route candidate
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
3.7K MWh
Latest Month
194.6K MWh
Annual Generation
12.8%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
1467 lb/MWh
NOx
0.366 lb/MWh
SO₂
0.007 lb/MWh
CH₄
0.028 lb/MWh
N₂O
0.003 lb/MWh
Capacity Factor
8.5%
Annual Net Gen
128 GWh
CO₂eq
1469 lb/MWh
Subregion
SERC Mississippi Valley
Gas turbine · Entergy Texas, Inc. · Data from 2022–2024
$448/kW
Installed Cost
$-0/kW
Annual CapEx
$41.7/MWh
Operating Cost
Annual Capital & Operating Expenses
Cumulative Installed Cost
Per-Unit Cost Trends
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
MISO
LMP Node
ESS.CYPRESS1CT
Pricing Hub
TEXAS.HUB
Node Source
EIA-860 direct report
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-04-09