57.7 MW Black Liquor operating in Jasper, TX
57.7 MW
Nameplate Capacity
3
Generators
units
Wood/Wood Waste Biomass
Technology
1954
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Plant reference point
30.3419, -94.0656
Reference point reported to EIA.
County
Jasper, TX
Nearby Plants
The starting substation is nearby, but its connection to this plant is unconfirmed.
1 mapped line section connects the two facilities over 5.137 km. At least one endpoint uses a nearby spatial match.
The actual electrical circuit, the official point of interconnection (POI), and the market settlement node require separate evidence.
Source checked 26 Oct 2026. Facility colors and shapes indicate source-reported function, not ownership or a confirmed plant connection.
This release uses a national source capture. Coverage and electrical detail vary by location; missing map data does not mean there is no connection. Lettered substation names are display labels where the source has no name. They do not identify ownership or function.
Source snapshot: 25 Oct 2026.
Method: source-node-path-v2 · Release: gcr-73c6ce9c596ada3ec63d5523
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | WestRock (TX) | Westrock Co | — |
| Owner(s) | WestRock (TX) | Westrock | — |
| Status | Operating | operating | — |
Summary generated Mar 22, 2026 (UTC).
Source dates used by this summary were not recorded.
These may postdate the saved summary; they do not establish which inputs it used.
The WestRock (TX) power plant, located in Jasper County, Texas, has a total capacity of 57.7 MW across three generators. The plant's primary fuel source is biomass, specifically wood and wood waste. It began operating in 1954 and is owned and operated by WestRock (TX), a subsidiary of Westrock. The plant operates within the Midcontinent Independent Transmission System Operator, Inc. (MISO) balancing authority and the TRE NERC region.
In the most recent year with available data, the WestRock (TX) plant generated 415,158 MWh of electricity, achieving a capacity factor of 81.9%. Among biomass plants in Texas, WestRock (TX) ranks second out of three facilities. Nationally, it ranks 42nd out of 66 biomass plants.
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
138.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Industrial
Sector
Industrial CHP
Connection evidence
Mapped route candidate
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
37.6K MWh
Latest Month
415.2K MWh
Annual Generation
81.9%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
110 lb/MWh
NOx
0.681 lb/MWh
SO₂
2 lb/MWh
CH₄
0.121 lb/MWh
N₂O
0.028 lb/MWh
Capacity Factor
80.5%
Annual Net Gen
407 GWh
CO₂eq
121 lb/MWh
Subregion
ERCOT All
2013
$3,495/kW
Est. Construction Cost
Total estimated cost: $201.7M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Evadale Substation · 138 kV
Substation Distance
< 10 km
Operator
Entergy
Coord Source
OSM spatial
Market Position
ISO/RTO Market
MISO
LMP Node
—
Pricing Hub
TEXAS.HUB
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-26
View all articlesForward forecasts, scenario decomposition, and risk-decision tooling for this asset.