Hardin County Peaking Facility is a 173 MW Natural Gas Fired Combustion Turbine asset in MISO (Midcontinent), currently Operating.
Hardin County Peaking Facility is reported in Texas since 2001 under Entergy. Available operating and financial measures include 12.8% capacity factor and 195 GWh annual generation; $448/kW reported CapEx.
- Location
- Hardin, Texas
- Technology
- Natural Gas Fired Combustion Turbine
- Owner / parent
- Entergy
- Operator
- Entergy Texas Inc.
- Grid
- MISO (Midcontinent)
- Plant ID
- 56604
What stands out
Hardin County Peaking Facility is a 173 MW Natural Gas Fired Combustion Turbine asset in Texas with status Operating.
Latest annual operating measures report 12.8% capacity factor and 195 GWh annual generation.
Available financial measures include $41.7/MWh OpEx, $448/kW CapEx.
Latest linked story: “Entergy Texas issues RFP for new power generation to support Southeast Texas growth” (itemonline.com, 2026-03-09).
Market and operating context
- ISO / market
- MISO (Midcontinent)
- Balancing authority
- Midcontinent Independent Transmission System Operator, Inc..
- NERC region
- SERC
- State rank
- #131 of 325
- National rank
- #811 of 2,025
Why it matters
For this asset in MISO (Midcontinent), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.