Search plants, projects, owners, and states
19.6 MW Hydro operating in Imperial, CA
19.6 MW
Nameplate Capacity
2
Generators
units
Conventional Hydroelectric
Technology
1941
Operating Since
Coordinates
32.7053, -115.2191
County
Imperial, CA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Imperial Irrigation District | Imperial Irrigation District | — |
| Owner(s) | Imperial Irrigation District | Imperial Irrigation District | — |
| Status | Operating | — | — |
Drop 4 is a hydroelectric power plant located in Imperial County, California. The plant, owned and operated by Imperial Irrigation District, has a total capacity of 19.6 MW derived from two generators. It commenced operations in 1941, utilizing water as its primary fuel source and conventional hydroelectric technology. The plant operates within the Imperial Irrigation District balancing authority and the Western Electricity Coordinating Council (WECC) NERC region.
In the most recent year with available data, Drop 4 generated 78,220 MWh of electricity, achieving a capacity factor of 45.4%. The plant is ranked as the 95th largest in California out of 247 plants and 492nd nationally out of 1464 plants.
Generated from EIA, GEM, and public data sources
Grid Region
California (non-ISO)
Market
Bilateral Market
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
Imperial Irrigation District (IID)
Grid Voltage
92.0 kV
Regulatory Status
RE — Regulated
Entity Type
Political Subdivision
Sector
Electric Utility
2.7K MWh
Latest Month
78.2K MWh
Annual Generation
45.4%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2013
$2,294/kW
Est. Construction Cost
Total estimated cost: $45.0M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →This plant is in a bilateral market territory without organized wholesale pricing. Nodal pricing data is not available.
Last updated 2026-03-26
View all articlesNo Ask reports yet for this entity.
Ask about Drop 4Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demo