Imperial Irrigation District includes 761 MW of operating capacity in the current result.
13 operating plants span 1 states. No linked queue projects were returned in the current result. Hydroelectric is the largest operating technology group at 84 MW.
- Coverage
- 13 plants across 1 states
- Largest asset
- El Centro Hybrid · 388 MW
- Leading technology
- Hydroelectric · 84 MW
What stands out
13 operating plants total 761 MW across 1 states.
Hydroelectric is the largest operating technology group at 84 MW across 7 plants.
El Centro Hybrid is the largest returned operating asset at 388 MW.
Latest linked story: “Energy consultant had financial conflicts of interest, Imperial Irrigation District says” (The Desert Sun, 2018-01-12).
Market and operating context
- Largest state footprint
- California · 761 MW
- Technology concentration
- Hydroelectric represents 84 MW
Why it matters
The operating footprint shows what exists today, while the queue pipeline and latest curated events show where the portfolio or market may be changing. Reading those layers together avoids treating proposed capacity as operating capacity.