19.5 MW Hydro out of service in La Paz, AZ
19.5 MW
Nameplate Capacity
3
Generators
units
Conventional Hydroelectric
Technology
1993
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Plant reference point
34.1682, -114.2774
Reference point calculated from the selected footprint.
Mapped site outline
Site outline mapped in OpenStreetMap. It is not a surveyed or legal boundary.
County
La Paz, AZ
Nearby Plants
The line is mapped. The plant’s electrical connection and official point of interconnection still need confirmation.
1 mapped line section connects the two facilities over 20.846 km. The line reaches both facility footprints in the source data.
The actual electrical circuit, the official point of interconnection (POI), and the market settlement node require separate evidence.
Source checked 26 Oct 2026. Facility colors and shapes indicate source-reported function, not ownership or a confirmed plant connection.
This release uses a national source capture. Coverage and electrical detail vary by location; missing map data does not mean there is no connection. Lettered substation names are display labels where the source has no name. They do not identify ownership or function.
Source snapshot: 25 Oct 2026.
Reverse views of the same physical route are grouped in the route selector. All source records are retained.
Method: source-node-path-v2 · Release: gcr-73c6ce9c596ada3ec63d5523
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Colorado River Indian Irr Proj | — | — |
| Owner(s) | Colorado River Indian Irr Proj | — | — |
| Status | Out of service | — | — |
Summary generated Mar 22, 2026 (UTC).
Source dates used by this summary were not recorded.
These may postdate the saved summary; they do not establish which inputs it used.
Headgate Rock is a 19.5 MW hydroelectric power plant located in La Paz County, Arizona. The plant began operating in 1993 and utilizes conventional hydroelectric technology. It consists of 3 generators and is owned and operated by the Colorado River Indian Irrigation Project. Headgate Rock is the 8th largest hydroelectric plant in Arizona (out of 11) and ranks 496th nationally (out of 1464).
The plant's primary fuel source is water (WAT). In the most recent year of reported data, Headgate Rock generated 35,773 MWh of electricity, achieving a capacity factor of 20.9%. The balancing authority for the plant is the Western Area Power Administration - Desert Southwest Region, and it operates within the WECC NERC region.
Grid Region
Mountain West
Market
WEIM Participant
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
Western Area Power Administration - Desert Southwest Region (WALC)
Grid Voltage
69.0 kV
Regulatory Status
RE — Regulated
Entity Type
Federal
Sector
Electric Utility
Connection evidence
Mapped route candidate
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
2.2K MWh
Latest Month
35.8K MWh
Annual Generation
20.9%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$2,294/kW
Est. Construction Cost
Total estimated cost: $44.7M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in CAISO's Western Energy Imbalance Market (WEIM). Direct nodal pricing data is not yet available.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-26