Headgate Rock is a 20 MW Conventional Hydroelectric asset in Arizona, currently Out of service.
Headgate Rock is reported in Arizona since 1993 under Colorado River Indian Irr Proj. Available operating and financial measures include 20.9% capacity factor and 36 GWh annual generation; $2294/kW reported CapEx.
- Location
- La Paz, Arizona
- Technology
- Conventional Hydroelectric
- Owner / parent
- Colorado River Indian Irr Proj
- Operator
- Colorado River Indian Irr Proj
- Grid
- Western Area Power Administration - Desert Southwest Region
- Plant ID
- 7179
What stands out
Headgate Rock is a 20 MW Conventional Hydroelectric asset in Arizona with status Out of service.
Latest annual operating measures report 20.9% capacity factor and 36 GWh annual generation.
Available financial measures include $2294/kW CapEx.
Latest linked story: “Failure at Headgate Rock Dam leaves Parker Strip high and dry” (Havasu News, 2022-08-31).
Market and operating context
- Balancing authority
- Western Area Power Administration - Desert Southwest Region
- NERC region
- WECC
- State rank
- #8 of 11
- National rank
- #491 of 1,462
Why it matters
For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.