West Lorain Power Plant 345 kV (PJM-AG1-500) — Project Summary

Queue ID
PJM-AG1-500
Capacity
406.4 MW
Technology
Gas
Status
active
Location
Lorain, OH
Region
PJM
Developer
—
IA Status
IA Executed

West Lorain Power Plant 345 kV

PJM-AG1-500BetaActiveGasPJMLBNL + Live

406.4 MW generation in Lorain, OH · In queue since September 2020 · Proposed COD June 2031

BA: PJMISO/RTO: PJMNERC: RFCRC: PJM

406.4 MW

Capacity

1

Components

Gas

6y 2m

In Queue

IA Executed

IA Phase

COD target: 2031

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

10y 9m

Construction75%
Queue EntrySep 30, 2020

Interconnection request submitted to ISO/RTO

System Impact Study

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Engineering and Procurement

Project under construction

Typical: 24–48 months

Commercial Operation

Proposed COD: 2031-06-01

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Jun 1, 2031
From queue filing
Developer in saved assessment
—
Status at research time
IA Executed
Active in PJM queue with Interconnection Agreement executed (POI at Beaver 345 kV substation per infrasure.ai); no evidence of construction start or permitting milestones.
Financing
Not recorded
Research sources and reasoning (3 recorded sources)

low confidence at research time

  1. interconnection.fyi/project/pjm-ag1-500
  2. infrasure.ai/project/pjm-ag1-500-west-lorain-power-plant-345-kv
  3. cleanview.co/power-projects/planned/natural-gas-power-plants/ohio/AG1-500/west-lorain-power-plant-345-kv

Commercial operation date: Only queue-derived data exists: LBNL lists proposed COD 2031-06-01, and aggregator pages (interconnection.fyi, infrasure.ai, cleanview) simply mirror the PJM queue date. No developer press release or news article gives an independent, financing-backed COD.

Developer: LBNL developer field is null and infrasure.ai describes the developer as 'an unknown entity'. No press release or news names an owner. The PJM deactivation letter concerns the retired West Lorain Units 1 & 2 and does not identify the developer of this new project.

Status: LBNL lists ia_status 'IA Executed' and status 'active'; infrasure.ai confirms the executed IA and active status. No independent source indicates construction, withdrawal, or suspension.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 25, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The West Lorain Power Plant 345 kV is a proposed 406.4 MW gas-fired generation project located in Lorain County, Ohio. The project, developed by an unknown entity, is interconnected within the PJM Interconnection queue under queue ID PJM-AG1-500. It entered the queue on September 30, 2020, with a proposed commercial operation date of June 1, 2031. The point of interconnection is at the Beaver 345 kV substation, and the project's Interconnection Agreement (IA) has been executed.

The project is listed as active within the PJM queue. It is wholly composed of gas-fired generation, with a total capacity of 406.4 MW. The interconnecting utility is ATSI.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • PJM queue source as of: Oct 25, 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

OH

County

Lorain

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

—

Utility

ATSI

Entity

PJM

Service Type

NRIS

Point of Interconnection

Beaver 345 kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
PJM
Trading Hub
AEP-DAYTON HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
BEAV DUQ22 KV UNIT2
POI Substation
Beaver Valley Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.