West Lorain Power Plant 345 kV (PJM-AG1-500) — Project Summary

Queue ID
PJM-AG1-500
Capacity
406.4 MW
Technology
Gas
Status
active
Location
Lorain, OH
Region
PJM
Developer
IA Status
IA Executed

West Lorain Power Plant 345 kV

PJM-AG1-500BetaActiveGasPJMLBNL + Live

406.4 MW generation in Lorain, OH · In queue since September 2020 · Proposed COD June 2031

BA: PJMISO/RTO: PJMNERC: RFCRC: PJM

406.4 MW

Capacity

1

Components

Gas

5y 10m

In Queue

IA Executed

IA Phase

COD target: 2031

Interconnection

Total Duration

10y 9m

Construction75%
Queue EntrySep 30, 2020

Interconnection request submitted to ISO/RTO

System Impact Study

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 24–48 months

Commercial Operation

Proposed COD: 2031-06-01

Cross-source intelligence
Beta
Low confidence·0 sources·as of 2026-06-01
Expected COD
2031-06-01
From queue filing
Developer
Status
Active
Active — IA Executed in PJM queue, no public construction or financing announcements found
Financing
Unannounced
Key milestones
IA executedMost recent

Interconnection Agreement executed per PJM queue status

About

The West Lorain Power Plant 345 kV is a proposed 406.4 MW gas-fired generation project located in Lorain County, Ohio. The project, developed by an unknown entity, is interconnected within the PJM Interconnection queue under queue ID PJM-AG1-500. It entered the queue on September 30, 2020, with a proposed commercial operation date of June 1, 2031. The point of interconnection is at the Beaver 345 kV substation, and the project's Interconnection Agreement (IA) has been executed.

The project is listed as active within the PJM queue. It is wholly composed of gas-fired generation, with a total capacity of 406.4 MW. The interconnecting utility is ATSI.

Generated from interconnection queue and public data sources

Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

OH

County

Lorain

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

ATSI

Entity

PJM

Service Type

NRIS

Point of Interconnection

Beaver 345 kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
PJM
Trading Hub
AEP-DAYTON HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
BEAV DUQ22 KV UNIT2
POI Substation
Beaver Valley Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about West Lorain Power Plant 345 kV
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.